Installation and Configuration
Back to Installation and Commissioning
Target Info
- Survey, Density, Windows and other Info of the Target
- Hall A target gas cell fill pressures and temperatures halog
- He3 Certification file
- Hall-A Tritium Target FSD Verification Checklist file
Survey Info
Beam Instrumentation
Spectrometer Angles
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
17 | 12/04/2017 | SRC | xxxx ~ xxxx | link |
- HRS-R
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
17 | 12/04/2017 | SRC | xxxx ~ xxxx | link |