Run Meeting: February 23th, 2018

From Tritium Experiments Group
Revision as of 15:05, 23 February 2018 by Sanghwa (talk | contribs)
Jump to navigation Jump to search

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of past 24h:

- Smooth running with stable beam at ~22.2uA after recovery from the NL vacuum issue around 4pm. Opportunistic RF recovery for SL also took place during that downtime.

- During swing shift, we took empty cell data while MCC was trying to push for higher current for Hall C.

- Reached to 10k with He3 for kin#16 during owl shift.

- Downtime starting from 1pm for the cooling fan replacement for 1L22.

- Controlled access during the downtime: Jessie and techs went down to the Hall, Bill for raster check (https://logbooks.jlab.org/entry/3537043, https://logbooks.jlab.org/entry/3537195)


Plan: Back to production mode

Slides

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653