Fall Installation and Commissioning

From Tritium Experiments Group
Revision as of 13:11, 8 August 2018 by Yez (talk | contribs)
Jump to navigation Jump to search

Back to Tritium-Main

Back to 2018 Spring Run Plan

Installation and Configuration

With First Beam (2019-09-04 - 2019-09-10)

  1. Beamline
    1. Beam Centering
    2. Raster Size Calibration
    3. BPM Calibration (pedestal run, Bullseye scan)
    4. ARC Energy Measurement (parasitic only)
  2. DAQ and Trigger Checkout
  3. Detector Checkout / Optics
  4. Detector Calibrations (in parallel with other activities once we have the electron data)