Fall Installation and Commissioning
Jump to navigation
Jump to search
- We can adapt the list tasks during the Spring 2018 run
Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- ARC Energy Measurement (parasitic only)
- DAQ and Trigger Checkout
- Detector Checkout / Optics
- Detector Calibrations (in parallel with other activities once we have the electron data)