Fall Installation and Commissioning
Jump to navigation
Jump to search
Back to Tritium-Main Back to 2018 Fall Run Plan
- We can link to the list tasks during the Spring 2018 run
- Create new Installation and Commissioning plan here.
Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- ARC Energy Measurement (parasitic only)
- DAQ and Trigger Checkout (regular)
- Detector Checkout / Optics (regular)
- Detector Calibrations (in parallel with other activities once we have the electron data) (regular)