Additional Installation and Commissioning
Jump to navigation
Jump to search
Back to 2018 Spring Run Plan Back to Tritium-Main
Installation and Configuration
With First Beam (12/04/2017 - 12/10/2017
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- ARC Energy Measurement (parasitic only)
- DAQ and Trigger Checkout
- Detector Checkout with single foil, multi foils, and target cells
- Optics commissioning HRS Optics Run
- Detector Calibrations (in parallel with other activities once we have the electron data)