Run Meeting: February 27th, 2018

From Tritium Experiments Group
Revision as of 14:40, 27 February 2018 by Sanghwa (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of past 24h:

- Swing: LHRS magnets brought back up around 18:30. Resumed production only with the left arm for H3. RHRS back in business around 23:30. Moved target to D2 and started data taking with both spectrometers.

- Owl: Smooth running. Target changed to He3 around 2:45 as we finished column 19/24.

- Day: RF recovery scheduled for 4 hours. Started with RF diagnostics at 8:30 sending high current to A&C for finding troublesome cavities. Target stayed in Home position throughout the RF work. Back in production mode around 12:40 as planned.


Plan: Continue production!!!

Slides

RC report: https://drive.google.com/open?id=1aFVppjiLRIKnCEr5snAVwcM7IDLNwuva

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653