New Installation and Configuration

From Tritium Experiments Group
Revision as of 12:23, 13 August 2018 by Yez (talk | contribs) (Created page with "[https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] ==Target Info == * Survey, Density, Windows...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Installation and Commissioning

Target Info

  • Survey, Density, Windows and other Info of the Target [https:// link]
  • Hall A target gas cell fill pressures and temperatures [https:// halog]
  • He3 Certification [https:// file]
  • Hall-A Tritium Target FSD Verification Checklist [https:// file]

Survey Info

Beam Instrumentation

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
17 09/04/2018 SRC xxxx ~ xxxx link
  • HRS-R
Angle Time Experiment Run Number Ranges Report Comment
17 09/04/2018 SRC xxxx ~ xxxx link