Fall Installation and Commissioning

From Tritium Experiments Group
Jump to navigation Jump to search

Back to Tritium-Main Back to 2018 Fall Run Plan

  • We can link to the list tasks during the Spring 2018 run
  • Create new Installation and Commissioning plan here.

New Installation and Configuration

With First Beam (2019-09-04 - 2019-09-10)

  1. Beamline
    1. Beam Centering (standard)
    2. Raster Size Calibration (standard)
    3. ARC Energy Measurement (standard, parasitic only)
    4. Fall2018 BPM Calibration See Spring2018 BPM Calibration (pedestal run, Bullseye scan)
  2. DAQ and Trigger Checkout (regular)
    1. New SRC DAQ and Trigger Checkout
    2. New ee'K DAQ and Trigger Checkout
  3. Detector Checkout / Optics (regular)
    1. Aerogel Cherenkov Detector Checkout
    2. Gas Cherenkov Detector Checkout
    3. New Optics Checkout
  4. Detector Calibrations (in parallel with other activities once we have the electron data) (regular)
    1. Aerogel Cherenkov Detector Calibration
    2. Gas Cherenkov Detector Calibration