Back to Installation and Commissioning
- E0 = 4.22 GeV
- HRS-L: Ep = 3.93 GeV/c, Theta = 17 Degrees
- HRS-R: Ep = 3.0 GeV/c, Theta = 24 Degrees
- Raster On* (2.5mmx2mm MCC = 2mmx2mm on target)
Run number |
Target |
Beam Current |
Comment |
891 |
Empty Cell |
22.5uA |
100K Events after cut |VZ|<7.5cm |
924 |
Empty Cell |
5uA |
100K Events after cut |VZ|<7.5cm |
- For the rest of the run, take 100K Events for each run after cutting |VZ|<7.5cm. (Will update this number with a correction factor from the Empty-Target Cell run)
Run number |
Target |
Beam Current |
Comment |
|
H1 |
22.5uA |
|
|
H1 |
15uA |
|
|
H1 |
10uA |
|
|
H1 |
5uA |
|
|
H1 |
2.5uA |
|
Run number |
Target |
Beam Current |
Comment |
|
D2 |
22.5uA |
|
|
D2 |
15uA |
|
|
D2 |
10uA |
|
|
D2 |
5uA |
|
|
D2 |
2.5uA |
|
Run number |
Target |
Beam Current |
Comment |
|
H3 |
22.5uA |
|
|
H3 |
15uA |
|
|
H3 |
10uA |
|
|
H3 |
5uA |
|
|
H3 |
2.5uA |
|
|
H3 |
1uA |
|
Run number |
Target |
Beam Current |
Comment |
|
He3 |
22.5uA |
|
|
He3 |
15uA |
|
|
He3 |
10uA |
|
|
He3 |
5uA |
|
|
He3 |
2.5uA |
|
Run number |
Target |
Beam Current |
Comment |
|
C12 |
22.5uA |
|
|
C12 |
15uA |
|
|
C12 |
10uA |
|
|
C12 |
5uA |
|
|
C12 |
2.5uA |
|
Run number |
Target |
Beam Current |
Comment |
|
Dummy |
24uA |
|
|
Dummy |
15uA |
|
|
Dummy |
10uA |
|
|
Dummy |
5uA |
|
|
Dummy |
2.5uA |
|