RC: Carlos Ayerbe
Summary of past 24h:
Accelerator
- MoMod Studies --> production (Swing Shift)
- Normal operation (Owl Shift)
- Beam down >2h (Excessive halo trips are occurring) (Day Shift)
Swing shift
- Production
Owl shift
- Production
Day shift
- Production until ~10:30
- Jack entered to try to wake up the Right Arm (Controlled Access) https://logbooks.jlab.org/entry/3615276
- Heidi did a short access to check a possible leak in the Helium return line (not us!)
- Hall work finished ~11:30 and beam restored --> Carbon hole --> restored production 3He.
- ~14:45 beam dump diffuser blower tripped (no Hall A beam).
- Right Arm is working
Plan:
- Take data as normal, 3He and 3H
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934