Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
m
m
Line 30: Line 30:
 
<li> [[Detector Checkout with single foil, multi foils, and target cells]]
 
<li> [[Detector Checkout with single foil, multi foils, and target cells]]
  
<li> [[HRS Optics Run]]  
+
<li> [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning HRS Optics Run]
  
 
<li> [[Target Boiling Study]]
 
<li> [[Target Boiling Study]]
  
 
<li> [[Detector Calibrations]] (in parallel with other activities once we have the electron data)
 
<li> [[Detector Calibrations]] (in parallel with other activities once we have the electron data)
 
 
  
 
</ol>
 
</ol>
 
= [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] =
 
 
== Target Boiling Study ==
 
* <b>H3 Target</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>25uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>15uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>5uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
* <b>He3 Target</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>25uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>15uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>5uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
* <b>C12 target for a normalization check for beam-current dependent rate check.</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>25uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>15uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>5uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
= Beam Energy Measurements =
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Energy of central ray (MeV)</td>
 
    <td>Dispersive mode</td>
 
    <td>Halog entry</td>
 
  </tr>
 
  <tr>
 
    <td>11000.00 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 4400 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 2200 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 

Revision as of 19:36, 29 November 2017