Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
m
Line 34: Line 34:
 
<li> [[Target Boiling Study]]
 
<li> [[Target Boiling Study]]
  
<li> [[Detector Calibrations]] (in parallel with other activities once we have the electron data)
+
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data)
  
 
</ol>
 
</ol>

Revision as of 19:38, 29 November 2017