Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(40 intermediate revisions by 3 users not shown)
Line 2: Line 2:
 
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
 
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
  
=Installation Schedule=
+
=[[Installation and Configuration]]=
  
==Target Installation==
+
=Before Beam (by 12/04/2017) =
 
 
 
 
==Other Installation (e.g.,parasitic test)==
 
 
 
==Survey Info==
 
 
 
==Beam Instrumentation==
 
 
 
==Target Positions==
 
 
 
==Spectrometer Angles==
 
* <b>HRS-L</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Angle</td>
 
    <td>Time</td>
 
    <td>Experiment</td>
 
    <td>Run Number Ranges </td>
 
    <td>Report </td>
 
    <td>Comment </td>
 
  </tr>
 
  <tr>
 
    <td> 20 </td>
 
    <td> 02/01/2017</td>
 
    <td>MARATHON</td>
 
    <td> 1111 ~ 2222 </td>
 
    <td> link </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
* <b>HRS-L</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Angle</td>
 
    <td>Time</td>
 
    <td>Experiment</td>
 
    <td> Run Number Ranges </td>
 
    <td>Report </td>
 
    <td>Comment </td>
 
  </tr>
 
  <tr>
 
    <td> 20 </td>
 
    <td> 02/01/2017</td>
 
    <td>MARATHON</td>
 
    <td> 1111 ~ 2222 </td>
 
    <td> link </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
=Commissioning Plan=
 
==Before Beam==
 
 
* Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]]
 
* Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]]
 +
* [[ HRS Detector Checkout]]
 +
* [[ Beamline ]]
 +
* [[Spectrometer Angles ]]
 +
* [[Magnets]]
 +
* [[DAQ]]
 +
* [[Software]]
  
* HRS Detector Checkout
+
=With First Beam (12/04/2017 - 12/10/2017=
** VDC Wire Hits [[:File:placeholder.pdf|(placeholder slides)]]
 
** TDC distributions of scintillators, VDCs, and GC [[:File:placeholder.pdf|(placeholder slides)]]
 
** FastBus ADC distributions of scintillators, GC, and calorimeters [[:File:placeholder.pdf|(placeholder slides)]]
 
** FlashADC distributions of scintillators, GC, and calorimeters [[:File:placeholder.pdf|(placeholder slides)]]
 
** HV GUI (we check this frequently anyway....)
 
** Document the Official HV save file
 
 
 
* Beamline
 
** Twiddle Measurement to check BPMs [[:File:placeholder.pdf|(placeholder slides)]]
 
** Clock run with raster on, check and compare fastbus and Flash raster signals [[:File:placeholder.pdf|(placeholder slides)]]
 
 
 
* Spectrometer Angles
 
** LHRS: ??.?? degrees
 
** RHRS: ??.?? degrees
 
 
 
* Magnets
 
** Decide on scaling function for Q1s (not linear!)
 
** Test LHRS full momentum range
 
** Test RHRS full momentum range
 
** LHRS Initial Momentum: ??.?? GeV/c
 
** RHRS Initial Momentum: ??.?? GeV/c
 
 
 
 
 
* Software
 
** Demonstrate/write-up new Strip Chart procedure
 
** Verify BTA functionality
 
** Demonstrate working Podd1.6, ROOT6, replay and online plots with cosmics
 
** Demonstrate updated spotL/spotR code (take special run with clock trigger and raster on)
 
** Demonstrate updated online liveTime calculations with cosmics/clock
 
 
 
==With First Beam==
 
  
 
<ol>
 
<ol>
Line 99: Line 21:
 
   <li> [[Beam Centering]]
 
   <li> [[Beam Centering]]
 
   <li> [[Raster Size Calibration]]
 
   <li> [[Raster Size Calibration]]
   <li> [[BPM Calibration]] (Bullseye scan)
+
   <li> [[BPM Calibration]] (pedestal run, Bullseye scan)
 
   <li> [[BCM Calibration]]
 
   <li> [[BCM Calibration]]
 
   <li> [[ARC Energy Measurement]] (parasitic only)
 
   <li> [[ARC Energy Measurement]] (parasitic only)
 
  </ol>
 
  </ol>
  
<li> Trigger Timing Checkout
+
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout]
  
<li> Detector Checkout
+
<li> [[Detector Checkout with single foil, multi foils, and target cells]]
<ol>
 
  <li> VDC wire hits and efficiencies
 
  <li> TDC distributions of scintillators, VDCs, and GC
 
  <li> fastbus ADC distributions of scintillators, GC, and calorimeters
 
  <li> FlashADC distributions of scintillators and GC
 
  <li> Check all scalers
 
  <li> check thresholds
 
</ol>
 
  
<li> HRS Optics
+
<li> [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning HRS Optics Run]
  
<li> Detector Calibrations
+
<li> [[Target Boiling Study]]
  
<li> Target
+
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data)
  
 
</ol>
 
</ol>
 
=Commissioning Results=
 
== [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] ==
 
== BPM calibration runs (Bull's eye scan) ==
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Relative position</td>
 
    <td>LHRS CODA run</td>
 
    <td>RHRS CODA run</td>
 
    <td>Harp scan entry no.</td>
 
  </tr>
 
  <tr>
 
    <td>(0,0)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(2,2)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(2,-2)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(-2,-2)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(-2,2)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(3,3)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(-3,-3)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
== BCM calibration runs ==
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Beam Current (uA)</td>
 
    <td>LHRS CODA run</td>
 
    <td>RHRS CODA run</td>
 
    <td>BCM logger</td>
 
    <td>Comments</td>
 
  </tr>
 
  <tr>
 
    <td>5</td>
 
    <td> </td>
 
    <td> </td>
 
    <td></td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>10 </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
<tr>
 
    <td>15 </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
<tr>
 
    <td>20 </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
<tr>
 
    <td>25 </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
== Target Boiling Study ==
 
* <b>H3 Target</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>25uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>15uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>5uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
* <b>He3 Target</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>25uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>15uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>5uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
* <b>C12 target for a normalization check for beam-current dependent rate check.</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>25uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>15uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>5uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
= Beam Energy Measurements =
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Energy of central ray (MeV)</td>
 
    <td>Dispersive mode</td>
 
    <td>Halog entry</td>
 
  </tr>
 
  <tr>
 
    <td>11000.00 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 4400 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 2200 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
=Dedicated Commissioning Plans=
 
==[[(ee')]] SRC (x&gt;1) ==
 
==[[MARATHON]]==
 
==[[(ee'p)]] SRC==
 
==[[(ee'K)]] Hypernucleus==
 

Latest revision as of 11:03, 30 November 2017