Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(24 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
=[[Installation and Configuration]]=
 
=[[Installation and Configuration]]=
  
=Before Beam=
+
=Before Beam (by 12/04/2017) =
 
* Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]]
 
* Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]]
 
 
* [[ HRS Detector Checkout]]
 
* [[ HRS Detector Checkout]]
 
 
* [[ Beamline ]]
 
* [[ Beamline ]]
 +
* [[Spectrometer Angles ]]
 +
* [[Magnets]]
 +
* [[DAQ]]
 +
* [[Software]]
  
 
+
=With First Beam (12/04/2017 - 12/10/2017=
* Spectrometer Angles
 
<b>LHRS</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Angle</td>
 
    <td>Momentum</td>
 
    <td>Duration</td>
 
    <td>Experiment</td>
 
    <td>Run Number Ranges </td>
 
    <td>Report </td>
 
    <td>Comment </td>
 
  </tr>
 
  <tr>
 
    <td> 17.0 </td>
 
    <td> 3.980 </td>
 
    <td> 175 hrs </td>
 
    <td> x>1 </td>
 
    <td> 1111 ~ 2222 </td>
 
    <td> link </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 17.0 </td>
 
    <td> 3.710 </td>
 
    <td> 27 hrs </td>
 
    <td> x>1 </td>
 
    <td> 1111 ~ 2222 </td>
 
    <td> link </td>
 
    <td> </td>
 
  </tr>
 
 
 
</table>
 
 
 
<b>RHRS</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Angle</td>
 
    <td>Momentum</td>
 
    <td>Time</td>
 
    <td>Experiment</td>
 
    <td> Run Number Ranges </td>
 
    <td>Report </td>
 
    <td>Comment </td>
 
  </tr>
 
  <tr>
 
    <td> 28.5 </td>
 
    <td> 2.910 </td>
 
    <td> 132 hrs</td>
 
    <td> x>1 </td>
 
    <td> ~90000 </td>
 
    <td> link </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 28.5 </td>
 
    <td> 2.715 </td>
 
    <td> 75 hrs</td>
 
    <td> x>1 </td>
 
    <td> ~90000 </td>
 
    <td> link </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 28.5 </td>
 
    <td> 2.530 </td>
 
    <td> 38 hrs</td>
 
    <td> x>1 </td>
 
    <td> ~90000 </td>
 
    <td> link </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
 
 
* Magnets
 
** Decide on scaling function for Q1s (not linear!)
 
** Test LHRS full momentum range
 
** Test RHRS full momentum range
 
** LHRS Initial Momentum: ??.?? GeV/c
 
** RHRS Initial Momentum: ??.?? GeV/c
 
 
 
* DAQ
 
** LHRS DAQ machine: adaq1
 
** RHRS DAQ machine: adaq2
 
** Currently Functional online analysis machines: adaq3
 
** Keep only necessary CODA configurations
 
** Setup/Test remote power cycle of all crates
 
 
 
* Software
 
** Demonstrate/write-up new Strip Chart procedure
 
** Verify BTA functionality
 
** Demonstrate working Podd1.6, ROOT6, replay and online plots with cosmics
 
** Demonstrate updated spotL/spotR code (take special run with clock trigger and raster on)
 
** Demonstrate updated online liveTime calculations with cosmics/clock
 
 
 
=With First Beam=
 
  
 
<ol>
 
<ol>
Line 120: Line 26:
 
  </ol>
 
  </ol>
  
<li> Trigger Timing Checkout
+
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout]
  
<li> Detector Checkout with single foil, multi foils, and target cells
+
<li> [[Detector Checkout with single foil, multi foils, and target cells]]
<ol>
 
  <li> VDC wire hits and efficiencies
 
  <li> TDC distributions of scintillators, VDCs, and GC
 
  <li> fastbus ADC distributions of scintillators, GC, and calorimeters
 
  <li> FlashADC distributions of scintillators and GC
 
  <li> Check all scalers
 
  <li> check thresholds
 
</ol>
 
  
 +
<li> [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning HRS Optics Run]
  
<li> HRS Optics with saturated Q1 (LHRS p0>3 GeV, RHRS?)
+
<li> [[Target Boiling Study]]
<ol>
 
  <li> Multifoil target:
 
  <ol>
 
    <li> one DIS run without sieve for y-target calibration
 
    <li> sieve on, take a long DIS run for theta, phi calibration
 
  </ol>
 
  <li> Hydrogen target: elastic peak check (move RHRS to a larger angle), and delta scan at +-2%, +-4% of elastic peak
 
</ol>
 
 
 
<li> Boiling Study at 17 degree on 3H, 3He, 2H, H targets and empty cell
 
 
 
<li> Detector Calibrations (in parallel with other activities once we have the electron data)
 
 
 
  
 +
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data)
  
 
</ol>
 
</ol>
 
= [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] =
 
 
== Target Boiling Study ==
 
* <b>H3 Target</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>25uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>15uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>5uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
* <b>He3 Target</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>25uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>15uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>5uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
* <b>C12 target for a normalization check for beam-current dependent rate check.</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>25uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>15uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>5uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
= Beam Energy Measurements =
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Energy of central ray (MeV)</td>
 
    <td>Dispersive mode</td>
 
    <td>Halog entry</td>
 
  </tr>
 
  <tr>
 
    <td>11000.00 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 4400 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 2200 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
=Dedicated Commissioning Plans=
 
==[[(ee')]] SRC (x&gt;1) ==
 
==[[MARATHON]]==
 
==[[(ee'p)]] SRC==
 
==[[(ee'K)]] Hypernucleus==
 

Latest revision as of 11:03, 30 November 2017