=[[Installation and Configuration]]=
 
=[[Installation and Configuration]]=
  
=Before Beam=
+
=Before Beam (by 12/04/2017) =
 
* Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]]
 
* Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]]
 
* [[ HRS Detector Checkout]]
 
* [[ HRS Detector Checkout]]
Line 13: Line 13:
 
* [[Software]]
 
* [[Software]]
  
=With First Beam=
+
=With First Beam (12/04/2017 - 12/10/2017=
  
 
<ol>
 
<ol>
Line 26: Line 26:
 
  </ol>
 
  </ol>
  
<li> [[Trigger Timing Checkout]]
+
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout]
  
 
<li> [[Detector Checkout with single foil, multi foils, and target cells]]
 
<li> [[Detector Checkout with single foil, multi foils, and target cells]]
Line 34: Line 34:
 
<li> [[Target Boiling Study]]
 
<li> [[Target Boiling Study]]
  
<li> [[Detector Calibrations]] (in parallel with other activities once we have the electron data)
+
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data)
  
 
</ol>
 
</ol>