Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 5: Line 5:
  
 
=Before Beam (by 12/04/2017) =
 
=Before Beam (by 12/04/2017) =
 
{{Font color|green|blue|This means "Done"}}
 
{{Font color|red|yellow|This means "Ongoing Issues"}}
 
{{Font color|||This means "To-Do"}}
 
 
 
* Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]]
 
* Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]]
 
* [[ HRS Detector Checkout]]
 
* [[ HRS Detector Checkout]]

Latest revision as of 11:03, 30 November 2017