Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
m
 
(62 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 +
[https://wiki.jlab.org/tegwiki/index.php/2017_Fall_Run <B>Back to 2017 Fall Run Plan</B>]
 
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
 
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>]
  
=Installation Schedule=
+
=[[Installation and Configuration]]=
  
==Target Installation==
+
=Before Beam (by 12/04/2017) =
 +
* Trigger Timing Checkout [[:File:placeholder.pdf|(placeholder slides)]]
 +
* [[ HRS Detector Checkout]]
 +
* [[ Beamline ]]
 +
* [[Spectrometer Angles ]]
 +
* [[Magnets]]
 +
* [[DAQ]]
 +
* [[Software]]
  
 +
=With First Beam (12/04/2017 - 12/10/2017=
  
==Other Installation (e.g.,parasitic test)==
+
<ol>
  
==Survey Info==
+
<li> Beamline
 +
<ol>
 +
  <li> [[Beam Centering]]
 +
  <li> [[Raster Size Calibration]]
 +
  <li> [[BPM Calibration]] (pedestal run, Bullseye scan)
 +
  <li> [[BCM Calibration]]
 +
  <li> [[ARC Energy Measurement]] (parasitic only)
 +
</ol>
  
==Beam Instrumentation==
+
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout]
  
==Target Positions==
+
<li> [[Detector Checkout with single foil, multi foils, and target cells]]
  
==Spectrometer Angles==
+
<li> [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning HRS Optics Run]
* <b>HRS-L</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Angle</td>
 
    <td>Time</td>
 
    <td>Experiment</td>
 
    <td>Run Number Ranges </td>
 
    <td>Report </td>
 
    <td>Comment </td>
 
  </tr>
 
  <tr>
 
    <td> 20 </td>
 
    <td> 02/01/2017</td>
 
    <td>MARATHON</td>
 
    <td> 1111 ~ 2222 </td>
 
    <td> link </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
  
* <b>HRS-L</b>
+
<li> [[Target Boiling Study]]
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Angle</td>
 
    <td>Time</td>
 
    <td>Experiment</td>
 
    <td> Run Number Ranges </td>
 
    <td>Report </td>
 
    <td>Comment </td>
 
  </tr>
 
  <tr>
 
    <td> 20 </td>
 
    <td> 02/01/2017</td>
 
    <td>MARATHON</td>
 
    <td> 1111 ~ 2222 </td>
 
    <td> link </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
  
=Commissioning Schedule=
+
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data)
== [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] ==
 
== BPM calibration runs (Bull's eye scan) ==
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Relative position</td>
 
    <td>LHRS CODA run</td>
 
    <td>RHRS CODA run</td>
 
    <td>Harp scan entry no.</td>
 
  </tr>
 
  <tr>
 
    <td>(0,0)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(2,2)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(2,-2)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(-2,-2)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(-2,2)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(3,3)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td>(-3,-3)</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
  
== BCM calibration runs ==
+
</ol>
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>LHRS CODA run</td>
 
    <td>RHRS CODA run</td>
 
    <td>BCM logger</td>
 
    <td>Comments</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td> </td>
 
    <td></td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
== Target Boiling Study ==
 
* <b>H3 Target</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>25uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>15uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>H3</td>
 
    <td>5uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
* <b>He3 Target</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>25uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>15uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>He3</td>
 
    <td>5uA</td>
 
    <td>2x2 cm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
 
 
* <b>C12 target for a normalization check for beam-current dependent rate check.</b>
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Run number</td>
 
    <td>Target</td>
 
    <td>Beam Current</td>
 
    <td>Raster Size </td>
 
    <td>E<SUB>beam</SUB> [GeV]</td>
 
    <td>P<SUB>0</SUB> [GeV/c]</td>
 
    <td>&theta;<SUB>e</SUB> [deg]</td>
 
    <td>Comment</td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>25uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>15uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> </td>
 
    <td>Carbon-Foil</td>
 
    <td>5uA</td>
 
    <td>2x2 mm</td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 
 
 
==Dedicated Commissioning Plans==
 
===[[MARATHON]]===
 
===[[Elastic]]===
 
===[[(ee')]] SRC (x&gt;1) ===
 
 
 
===[[(ee'p)]] SRC===
 
 
 
= Beam Energy Measurements =
 
<table border="1"  style="width:80%">
 
  <tr>
 
    <td>Energy of central ray (MeV)</td>
 
    <td>Dispersive mode</td>
 
    <td>Halog entry</td>
 
  </tr>
 
  <tr>
 
    <td>11000.00 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 4400 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
  <tr>
 
    <td> 2200 </td>
 
    <td> </td>
 
    <td> </td>
 
  </tr>
 
</table>
 

Latest revision as of 11:03, 30 November 2017