Difference between revisions of "Installation and Configuration"

From Tritium Experiments Group
Jump to navigation Jump to search
(Created page with "==Target Installation== ==Survey Info== ==Beam Instrumentation== ==Target Positions== ==Spectrometer Angles== * <b>HRS-L</b> <table border="1" style="width:80%"> <tr>...")
 
m
Line 1: Line 1:
 +
[https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>]
 +
 
==Target Installation==
 
==Target Installation==
  

Revision as of 19:18, 29 November 2017

Back to Installation and Commissioning

Target Installation

Survey Info

Beam Instrumentation

Target Positions

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link
  • HRS-R
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link