Difference between revisions of "Installation and Configuration"

From Tritium Experiments Group
Jump to navigation Jump to search
m
Line 2: Line 2:
  
 
==Target Info ==
 
==Target Info ==
 +
* Gas Pressure Dave Meekins's [https://logbooks.jlab.org/entry/3495700 halog]
  
 
==Survey Info==
 
==Survey Info==

Revision as of 15:51, 1 December 2017

Back to Installation and Commissioning

Target Info

  • Gas Pressure Dave Meekins's halog

Survey Info

Beam Instrumentation

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link
  • HRS-R
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link