Installation and Configuration

From Tritium Experiments Group
Revision as of 19:17, 29 November 2017 by Yez (talk | contribs) (Created page with "==Target Installation== ==Survey Info== ==Beam Instrumentation== ==Target Positions== ==Spectrometer Angles== * <b>HRS-L</b> <table border="1" style="width:80%"> <tr>...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Target Installation

Survey Info

Beam Instrumentation

Target Positions

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link
  • HRS-R
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link