Difference between revisions of "New Installation and Configuration"

From Tritium Experiments Group
Jump to navigation Jump to search
m
 
Line 24: Line 24:
 
   <tr>
 
   <tr>
 
     <td> 17 </td>
 
     <td> 17 </td>
     <td> 09/04/2018</td>
+
     <td> 09/24/2018</td>
 
     <td> SRC </td>
 
     <td> SRC </td>
 
     <td> xxxx ~ xxxx </td>
 
     <td> xxxx ~ xxxx </td>
Line 43: Line 43:
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
     <td> 17 </td>
+
     <td> 24 </td>
     <td> 09/04/2018</td>
+
     <td> 09/24/2018</td>
 
     <td>SRC</td>
 
     <td>SRC</td>
 
     <td> xxxx ~ xxxx </td>
 
     <td> xxxx ~ xxxx </td>

Latest revision as of 16:08, 22 September 2018

Back to Installation and Commissioning

Target Info

  • Survey, Density, Windows and other Info of the Target [https:// link]
  • Hall A target gas cell fill pressures and temperatures [https:// halog]
  • He3 Certification [https:// file]
  • Hall-A Tritium Target FSD Verification Checklist [https:// file]

Survey Info

Beam Instrumentation

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
17 09/24/2018 SRC xxxx ~ xxxx link
  • HRS-R
Angle Time Experiment Run Number Ranges Report Comment
24 09/24/2018 SRC xxxx ~ xxxx link