Difference between revisions of "NnL analysis meeting-20211104"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 1: Line 1:
<font size="5"><b>nn&Lambda; Analysis Meeting</b> </font>
+
<font size="5"><b>Meeting (nn&Lambda; Analysis / Hall C option)</b> </font>
  
 
=Information=
 
=Information=
Line 6: Line 6:
 
* via BlueJeans
 
* via BlueJeans
  
=Reports=
+
=nn&Lambda; (E12-17-003)=
 
==Bishnu==
 
==Bishnu==
 
[[Media:Lnn meeting Bishnu 20211104.pdf|Lnn_meeting_Bishnu_20211104.pdf]]
 
[[Media:Lnn meeting Bishnu 20211104.pdf|Lnn_meeting_Bishnu_20211104.pdf]]
Line 18: Line 18:
 
* Waiting for PTEP review.  
 
* Waiting for PTEP review.  
  
=Discussions=
+
=Hall C option=
==Hall C option==
+
==Drawing with vertical HES + horizontal HKS (Sho)==
* Sho showed us the drawing with vertical HES.
+
* &theta;<sub>ee'</sub> &sim; 8 deg, &theta;<sub>eK</sub> &sim; 10 deg <br>&rarr; Rough yield estimation will be done to check if it meets our requirement. <br> We will consider some treatments such as cutting a part of magnet if the expected yield is too small.
** &theta;<sub>ee'</sub> &sim; 8 deg
 
** &theta;<sub>eK</sub> &sim; 10 deg<br>&rarr; Rough yield estimation will be done to check if it meets our requirement. <br> We will consider some treatments such as cutting a part of magnet if the expected yield is too small.
 
  
 
=Next Meeting=
 
=Next Meeting=

Revision as of 00:23, 6 November 2021

Meeting (nnΛ Analysis / Hall C option)

Information

  • 20:00- on Nov 04, 2021 (JST)
  • Participants: Nue, Nagao, Pete, Guido, Franco, Suzuki, Bishnu, Itabashi, +
  • via BlueJeans

nnΛ (E12-17-003)

Bishnu

Lnn_meeting_Bishnu_20211104.pdf

  • Spectral fit
  • He is going to check event exceeded a bit over the accidental background at around -80 to -50 MeV.

Kosuke

  • He is trying to understand the code that Hiyama san gave him.

Suzuki

  • Waiting for PTEP review.

Hall C option

Drawing with vertical HES + horizontal HKS (Sho)

  • θee' ∼ 8 deg, θeK ∼ 10 deg
    → Rough yield estimation will be done to check if it meets our requirement.
    We will consider some treatments such as cutting a part of magnet if the expected yield is too small.

Next Meeting

  • November 18th, 2021