Difference between revisions of "Run Meeting: February 16th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(2 intermediate revisions by 2 users not shown)
Line 2: Line 2:
  
 
4:00PM Run Meeting, Counting house meeting room (200C)
 
4:00PM Run Meeting, Counting house meeting room (200C)
 +
 +
Summary of past 24h:
 +
 +
* Beam was away whole swing, and came back during the night at 1/3 of our requested intensity: => not much data throughout the night;
 +
* MCC setup a ''plan of attack'' to tackle the machine issues
 +
* => beam back at the very end of the day for Hall A and C, almost at nominal current
 +
* (albeit with some minor tuning still going on, at injector level, and beamline tuning going on for halls B and D).
  
 
Plan: take production data for kin15 and 16 (if beam)
 
Plan: take production data for kin15 and 16 (if beam)
  
There is not been much data throughout the night, and there is a lot to bet we will not get any beam today during the day shift.
 
 
Other issues to discuss ?
 
  
 
===Slides===
 
===Slides===
  
 
*Tyler K [https://hallaweb.jlab.org/dvcslog/H3/180216_144312/v2_RHRS_TMinuit_calibration.pdf Calorimeter Calibration] [https://hallaweb.jlab.org/dvcslog/H3/31 Mike's slides]
 
*Tyler K [https://hallaweb.jlab.org/dvcslog/H3/180216_144312/v2_RHRS_TMinuit_calibration.pdf Calorimeter Calibration] [https://hallaweb.jlab.org/dvcslog/H3/31 Mike's slides]
*Hanjie [https://hallaweb.jlab.org/dvcslog/H3/34 S0, S2, Cer gain match]
+
*Hanjie [https://hallaweb.jlab.org/dvcslog/H3/34 S0, S2, Cer gain match][https://wiki.jlab.org/tegwiki/index.php/File:S2,s0,cer_ADC_calibration.pdf slides]
 
*Evan [https://github.com/JeffersonLab/HallA-Online-Tritium/blob/master/replay/LHRS_auto.odef Pass1 ODEF discussion]
 
*Evan [https://github.com/JeffersonLab/HallA-Online-Tritium/blob/master/replay/LHRS_auto.odef Pass1 ODEF discussion]
  

Latest revision as of 20:01, 16 February 2018

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of past 24h:

  • Beam was away whole swing, and came back during the night at 1/3 of our requested intensity: => not much data throughout the night;
  • MCC setup a plan of attack to tackle the machine issues
  • => beam back at the very end of the day for Hall A and C, almost at nominal current
  • (albeit with some minor tuning still going on, at injector level, and beamline tuning going on for halls B and D).

Plan: take production data for kin15 and 16 (if beam)


Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653

To join via Browser: https://bluejeans.com/372278653/browser