Difference between revisions of "ShiftLeader"
Jump to navigation
Jump to search
Line 23: | Line 23: | ||
* Log the following in a shift summary in the [http://logbooks.jlab.org/book/halla HALOG]: | * Log the following in a shift summary in the [http://logbooks.jlab.org/book/halla HALOG]: | ||
** run list (describing the goal of this run: eg production on LH2, BMC calibration...) and report main statistic numbers | ** run list (describing the goal of this run: eg production on LH2, BMC calibration...) and report main statistic numbers | ||
− | ** any major events, including | + | ** any major events, including hall access |
*Post Snapshots of important information at <B> least </B> twice a shift. | *Post Snapshots of important information at <B> least </B> twice a shift. | ||
** Include- Hall A tools, BPM strip-charts, and BCM strip-charts. | ** Include- Hall A tools, BPM strip-charts, and BCM strip-charts. | ||
− | ** Include any | + | ** Include any snapshots of the details after a change. |
** Please feel free to post these Snapshots more often. | ** Please feel free to post these Snapshots more often. | ||
Revision as of 10:12, 16 October 2017
In the process of editing and updating this page. Please contact any of the Tritium Students for suggestions, ideas, help, or etc.
Back to Tritium-Main Back to Tritium main how-to
Direct link to the entire repository of information. (The original version of the current page.)
Shift Leader Responsibilities
- Communicate clearly and effectively with shift crews and MCC (7047), and log any status information to the HALOG
- Keep track of beam time accounting
- Learn how to keep track of the BTA with the BTA how-to.
- Consult the daily run plans and communicate with run coordinator whenever problems happen that cannot be solved by shift workers.
- Maintain data taking quality and an efficient use of beam time.
- Follow the directives in the COO
- Log the following in a shift summary in the HALOG:
- run list (describing the goal of this run: eg production on LH2, BMC calibration...) and report main statistic numbers
- any major events, including hall access
- Post Snapshots of important information at least twice a shift.
- Include- Hall A tools, BPM strip-charts, and BCM strip-charts.
- Include any snapshots of the details after a change.
- Please feel free to post these Snapshots more often.
List of useful How-Tos for shift Leader