Difference between revisions of "Phase 1"

From Ciswikidb
Jump to navigation Jump to search
 
(160 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Recent Updates ==
+
==Bluejeans Links==
 +
* Daily 8:00am + Wed 1:30 MCC => https://bluejeans.com/569476853
 +
* Daily 3:30pm shift turn over meeting => https://bluejeans.com/629943812
  
* '''Schedule - updated Jan 25, 2021 w/ Preliminary Commissioning Plan to end of SAD July 2, 2021''' [[media:210125_AIPINJ_Schedule.pdf]]
+
== Beam Commissioning ==
* '''Feb 1, 2021 - Preliminary songsheet release''' [[media:210201_PRELIMINARY_ACC0002845-0001, INJECTOR, REV C .pdf]]
+
* Joe's checklist, updated after 6/8 4p Beam Drivers Meeting [[media:210607_Phase1_Commissioning.docx]]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21170 '''Link to the''' Phase 1 ATLIS]
+
* Reza's checklist [[media:BeamINJphase1v5.pptx]]
 +
* [[Phase 1 Commissioning ATLIS tasks]]
 +
* [[Phase 1 Commissioning Schedule]]
  
==Planning, planning, planning...==
+
== Quick Links ==
: [[CIS Phase 1 work plans]]
+
* MCC Phone Numbers: 7046, 7047, 7048, 7049, 7877, 7878
: [[Phase 1 - HCO & Commissioning]]
+
* Quick reference, Rev17beta, Draft 6, 6/7/21 [[media:12GeV_injector_quick_reference_rev17_DRAFT-6.pdf]]
: [[AIPINJ - Upgrade Meetings]]
+
* Phase I Beam Commissioning ATLis: [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22060 22060]
: [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABbL3OnBkCCHeIvb8PQE3aZw?e=vpc8ZM 3D cad and released drawings on AIPINJ OneDrive Folder]
+
* [https://jeffersonlab.sharepoint.com/sites/CEBAFInjectorSetupProceduresDevelopment Injector Procedures Workspace]
: Long term planning - [[AIPINJ - Phase 1 and 2 Schedule]]
 
  
== Major Phase 1 Beamline Components ==
 
:[[200 kV gun]] - Cathode, anode and high voltage system
 
:[[200 kV NEG Coated BPM's]] - New BPM's on beam pipe, NEG coated and absolutely mapped
 
:[[Y-chamber Laser Window]] - Evaluating the best window to minimize birefringence under stress
 
:[[DR dipole (15 deg)]] - New 15 deg air core bend dipole replaces pre-existing DS dipole
 
:[[FX beamline and FY chopper solenoids]] - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
 
:[[PSS Kicker (upgraded for 200 kV upgrade)]] - New PSS kicker of reliable design to operate at 200 kV with shorter throw
 
:[[WF Wien Filters (200 kV upgrade)]] - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
 
:[[QW Wien quadrupoles (200 kV upgrade)]] - New quads designed for 200 keV energy, w/ improved magnetic field quality
 
:[[Chopping System (200 kV upgrade)]] - Choppers get higher power amplifiers, maybe a new chopping chamber
 
:[[Pre-buncher cavity (200 kV upgrade)]] - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
 
:[[NEG coated 2.5 inch OD BPM's]] - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
 
:[[HD steering coils]] - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy
 
:[[A1/A2 Aperture Steering Cubes]] - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
 
:[[Injector upgrade vacuum improvements]] - Improvements in the vacuum design, use of getter and ion pumps
 
:[[Beamline viewers]]
 
:[[LLRF 3.0 Phase 1]]
 
  
==ATLIS Tasks==
+
* '''Gold Setup from 6/30''': allsave 21889, beam to FC2 tune-mode (since this, have had spot move)
  
;AIPINJ
+
== Handy documents ==
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21370 Injector Wien Filter - system upgrade (2020 SAD)]
+
* 5/4/21 Phase 1 Settings for 130kV [[media:UIPhase1Settings130kV_2021.pdf]]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21332 Removal of PSS kicker magnet injector segment]
+
* 3/16/21 Beam Drivers Meeting Slides [[media:BeamDrivers_Pt2_3.16.21.pdf]]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21164 Mat'l Handling and Installation for Phase I of Inj. Upgrade]
+
* [https://wiki.jlab.org/ciswiki/index.php/January_25,_2021_-_Weekly_Commissioning_Meetings 1/25/21 Beam Drivers Preliminary Meeting]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20275 Install new IPM2I03]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
 
* [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21490 IOCSE11 & IOCINSE4 BPM Controls Update]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21570 Install PSS jumpers for laser work at the Injector]
 
  
;CIS SAD Tasks
+
== Installation ==
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
+
* [[AIPINJ - Upgrade Meetings]]
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
+
* [[Phase 1 Beamline Components]]
* [https://logbooks.jlab.org/entry/3844689 Fix IHWP readback during SAD]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21170 Phase 1 Installation ATLIS]
 +
* [[Phase 1 & SAD ATLIS Tasks]]
 +
* [[CIS Phase 1 work plans]]
 +
* [[Phase 1 System Readiness]]
  
;Injector Related SAD Tasks
+
== Documentation ==
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21431 Install and Commission Wien filter Power Supplies]] (magnet PS)
+
* [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABbL3OnBkCCHeIvb8PQE3aZw?e=vpc8ZM AIPINJ - Sharepoint (3D models, drawings, data)]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21353 Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ]]
+
* [[AIPINJ - Layouts]]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21330 PSS Injector Interface Chassis removal]
+
* [[AIPINJ - S&A Transmittals]]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade]
+
* [[AIPINJ - CED]]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21330 PSS Injector Interface Chassis removal]
+
* [[Injector Upgrade Documents and Links]]
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21542 PSS CAMAC Relay cards replacement with VME versions for Injector and BSY]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 I&C Injector Camac to Vme and camera upgrade]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17247 I&C Upgrade harps to PC104]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21331 I&C Upgrade existing ItoV System with ItoV VME cards]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 I&C Accelerator network re-survey]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21334 FAC Tunnel Fire Alarm and Suppression Replacement]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21242 Apply labels to I&C components during 2020 SAD]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21353 Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21020 Neutron Detector System Installation (SAD 2020)]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20644 UHV Power Supply Replacement (ISB)]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376 Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21373 Trim Utility Chassis Upgrade - All CEBAF Trim Racks]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21421 SAD 2020: P.M. of 24V Vacuum Power Supply Chassis]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21680 VME crate upgrade to IOCIN3]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21653 Remove old Sonitrol system hardware from NA and SA]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21696 Shutdown of Panel I-BT in the Injector]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21881 Insertable CAMAC to VME EPICS Controls upgrade Injector (iocin1->iocin1b) ]
 

Latest revision as of 22:10, 30 June 2021

Bluejeans Links

Beam Commissioning

Quick Links


  • Gold Setup from 6/30: allsave 21889, beam to FC2 tune-mode (since this, have had spot move)

Handy documents

Installation

Documentation