===LOTO Safety Pause and Restart Process===
 
===LOTO Safety Pause and Restart Process===
:*This applies to LOTO in OSP/LOSP/TOSP work control documents
+
* [[media:SLAC Electrical Shock Accident Investigation Report - Final.pdf]]
:: -Slides from 6/13/23 group meeting [[media:230612_CIS_LOTO.pptx]]
+
*Process applies to LOTO in OSP/LOSP/TOSP work control documents
:: -[[media:HEC Restart Process 052323 draft final.pdf]]
+
** Slides from 6/13/23 group meeting [[media:230612_CIS_LOTO.pptx]]
:: -[[media:HEC Restart Checklist 052323 draft final.pdf]]
+
** [[media:HEC Restart Process 052323 draft final.pdf]]
 
+
** [[media:HEC Restart Checklist 052323 draft final.pdf]]
  
 
===SF6 Systems Operated as a Pressure Vessel===
 
===SF6 Systems Operated as a Pressure Vessel===

Revision as of 10:29, 14 June 2023

LOTO Safety Pause and Restart Process

SF6 Systems Operated as a Pressure Vessel

  • CEBAF SF6 HVPS pressure vessel - ASME 100 psihttps://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417

SF6 Systems NOT Operated as a Pressure Vessel

CEBAF Specific OSPs, TOSPs and LOSPs

These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

LERF Specific



GTS Specific

Official documents managed via document-control for CEBAF

Other documents NOT managed via document-control