Line 30: Line 30:
 
** LERF Description of HVPS SF6 vessel and gas flow [[Media:LERF-FEL SF6 transfer system overview documented September 2021.pptx]]
 
** LERF Description of HVPS SF6 vessel and gas flow [[Media:LERF-FEL SF6 transfer system overview documented September 2021.pptx]]
  
===CEBAF Specific OSPs, TOSPs and LOSPs===
+
===CIS Specific OSPs===
  
6/16/23 - List of CIS (and division OSPs => [[media:Accelerator OSPs 20230616-CIS.xlsx]]
+
6/16/23 - complete list by ACC division => [[media:Accelerator OSPs 20230616-CIS.xlsx]]
  
These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
+
https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
  
 
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
 
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
Line 40: Line 40:
 
* CEBAF gun HV processing without Accelerator Injector segment PSS[https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=152257 CEBAF gun HV processing without Accelerator Injector segment PSS valid through 3-20-3026]
 
* CEBAF gun HV processing without Accelerator Injector segment PSS[https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=152257 CEBAF gun HV processing without Accelerator Injector segment PSS valid through 3-20-3026]
  
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP) : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
+
* CEABAF Wien filter high voltage measurement using voltage divider box (ACC-20-108912-OSP), valid through 11/19/2023: [https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=108912** [[Media:operational_safety_procedure_form_108912.pdf]]]
  
* Wien filter high voltage measurement using voltage divider box (ACC-20-108912-OSP), valid through 11/19/2023: [https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=108912** [[Media:operational_safety_procedure_form_108912.pdf]]]
+
* [https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?ENTRY_ID=144906 GTS operations OSP, valid through11/23/2025]
  
===LERF Specific===
+
* [https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?ENTRY_ID=144152 GTS HVPS OSP including LOTO procedures valid through11/4/2023]
  
 
* LERF Gun High Voltage Conditioning OSP, valid through 11/10/2021 [[Media:LERF gun OSP HV conditioning_80619_signed-off.pdf]]
 
* LERF Gun High Voltage Conditioning OSP, valid through 11/10/2021 [[Media:LERF gun OSP HV conditioning_80619_signed-off.pdf]]
 +
 
* LERF Gun photocathode re-cesiation (QE replenishing) DRAFT procedure [[Media:LERF Gun photocathode re-cesiation OSP.docx]]
 
* LERF Gun photocathode re-cesiation (QE replenishing) DRAFT procedure [[Media:LERF Gun photocathode re-cesiation OSP.docx]]
  
 +
===Incomplete or another group===
 +
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP)  : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
  
 
+
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP) : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
 
 
===GTS Specific===
 
 
 
* [https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?ENTRY_ID=144906 GTS operations OSP, valid through11/23/2025]<br />
 
* [https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?ENTRY_ID=144152 GTS HVPS OSP including LOTO procedures valid through11/4/2023]<br  />
 
  
 
===Official documents managed via document-control for CEBAF===
 
===Official documents managed via document-control for CEBAF===

Revision as of 12:18, 16 June 2023

LOTO Restart Process for OSP/LOSP/TOSP work control documents

SLAC Electrical Shock Discussion and JLAB LOTO Restart Process

SF6 Systems Operated as a Pressure Vessel

SF6 Systems NOT Operated as a Pressure Vessel

CIS Specific OSPs

6/16/23 - complete list by ACC division => media:Accelerator OSPs 20230616-CIS.xlsx

https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

Incomplete or another group

Official documents managed via document-control for CEBAF

Other documents NOT managed via document-control