Line 6: | Line 6: | ||
** Apr 27 - May 13 : Mini-down for Open House, PSS Cert : Install new RTP driver on Hall A laser for testing | ** Apr 27 - May 13 : Mini-down for Open House, PSS Cert : Install new RTP driver on Hall A laser for testing | ||
** May 13 - Jun 27 : PRAD / Bubble runs | ** May 13 - Jun 27 : PRAD / Bubble runs | ||
− | * Phase I : Jun 27 – July 25 | + | * Summer SAD Phase I : Jun 27 – July 25 |
**Construct 4th laser, modify laser table for 4-beam combination, include new EO pulse scheme | **Construct 4th laser, modify laser table for 4-beam combination, include new EO pulse scheme | ||
**Install 4-beam SCAM, laser macro-pulse chassis, PSS laser shutter chassis | **Install 4-beam SCAM, laser macro-pulse chassis, PSS laser shutter chassis | ||
**INJ lock-ups TBD for commissioning | **INJ lock-ups TBD for commissioning | ||
− | *Phase II : Jul 26 – Aug 19 | + | * Summer SAD Phase II : Jul 26 – Aug 19 |
**Contingency for Phase I | **Contingency for Phase I | ||
**Replace 3-channel VME SRF-style digital LLRF with 4-channel PC104 laser dedicated digital LLRF w/ 250/499 | **Replace 3-channel VME SRF-style digital LLRF with 4-channel PC104 laser dedicated digital LLRF w/ 250/499 |
Revision as of 12:17, 5 April 2016
We will meet Wed April 6 @ 11am in TL-1227 for monthly status update.
Schedule (Joe)
- Summer SAD
- Apr 06 - Apr 27 : Halls A/B/D
- Apr 27 - May 13 : Mini-down for Open House, PSS Cert : Install new RTP driver on Hall A laser for testing
- May 13 - Jun 27 : PRAD / Bubble runs
- Summer SAD Phase I : Jun 27 – July 25
- Construct 4th laser, modify laser table for 4-beam combination, include new EO pulse scheme
- Install 4-beam SCAM, laser macro-pulse chassis, PSS laser shutter chassis
- INJ lock-ups TBD for commissioning
- Summer SAD Phase II : Jul 26 – Aug 19
- Contingency for Phase I
- Replace 3-channel VME SRF-style digital LLRF with 4-channel PC104 laser dedicated digital LLRF w/ 250/499
- INJ and INJ/NL lock-ups TBD for commissioning
Laser Status (John)
- Status
SCAM-II (Roger)
- March
- Additional input from Kevin Jordan and Michael Tiefenback collected.
- Grames met with Injector group, solicited pre-draft input
- March 31st - Version 1 draft circulated media:SAMII_v1.docx to Flood, Hansknecht, Robertson, Higgins
- April
- Hansknecht and Robertson provided feedback
- Flood/Grames reviewed feedback and refined document punch list
- April 5th - Version 2 draft media:SAMII_v2.docx circulated to larger group for review
LLRF (Tomasz)
- March 14 - Draft of source requirements circulated media:LLRF-Source_v1.docx