Difference between revisions of "CIS Safety"

From Ciswikidb
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 65: Line 65:
 
* CEBAF Injector Power Supply SF6 Tank & 350 kV Receptacle (PS-ACC-17-001) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
 
* CEBAF Injector Power Supply SF6 Tank & 350 kV Receptacle (PS-ACC-17-001) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
 
* CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
 
* CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
* TL1137 MicroMott Polarimeter Operation Approved July 2020 Expires Aug 2023 https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103187
+
* TL1137 MicroMott Polarimeter Operation approved Aug 2023 https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=161272
 +
 
  
 
== Other documents NOT managed via document-control ==
 
== Other documents NOT managed via document-control ==

Latest revision as of 15:53, 10 January 2024

Spring 2023 Safety Pause

High Hazard Restart Process

LOTO Restart Process for OSP/LOSP/TOSP work control documents

SLAC Electrical Shock Discussion and JLAB LOTO Restart Process

CIS Specific OSPs

Submitted

6/16/23 - complete list by ACC division => media:Accelerator OSPs 20230616-CIS.xlsx

Draft

Incomplete or another group

SF6 Systems

Operated as a Pressure Vessel

NOT Operated as a Pressure Vessel

Official documents managed via document-control for CEBAF


Other documents NOT managed via document-control