Difference between revisions of "CEBAF Injector Upgrade"
Jump to navigation
Jump to search
Line 18: | Line 18: | ||
:[[Pre-buncher cavity (200 kV upgrade)]] - Existing stainless steel pre-buncher replaced by copper cavity for higher power. | :[[Pre-buncher cavity (200 kV upgrade)]] - Existing stainless steel pre-buncher replaced by copper cavity for higher power. | ||
:[[NEG coated 2.5 inch OD BPM's]] - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning | :[[NEG coated 2.5 inch OD BPM's]] - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning | ||
+ | :[[HD steering coils]] - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy | ||
:[[A1/A2 Aperture Steering Cubes]] - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils | :[[A1/A2 Aperture Steering Cubes]] - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils | ||
:[[Injector upgrade vacuum improvements]] - Improvements in the vacuum design, use of getter and ion pumps | :[[Injector upgrade vacuum improvements]] - Improvements in the vacuum design, use of getter and ion pumps |
Revision as of 15:13, 31 August 2020
The Injector Upgrade wiki begins here.
Planning, planning, planning...
- Phase 1 Planning ATLIS
- AIPINJ - Phase 1 and 2 Schedule
- AIPINJ - Layouts
- AIPINJ - Upgrade Meetings
- 3D cad and released drawings on AIPINJ OneDrive Folder
Major Phase 1 Beamline Components
- 200 kV gun - Cathode, anode and high voltage system
- DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
- FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
- PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker of reliable design to operate at 200 kV with shorter throw
- WF Wien Filters (200 kV upgrade) - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
- QW Wien quadrupoles (200 kV upgrade) - New quads designed for 200 keV energy, w/ improved magnetic field quality
- Chopping System (200 kV upgrade) - Choppers get higher power amplifiers, maybe a new chopping chamber
- Pre-buncher cavity (200 kV upgrade) - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
- NEG coated 2.5 inch OD BPM's - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
- HD steering coils - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy
- A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
- Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps
Major Phase 2 Beamline Components
ATLIS Tasks
- AIPINJ
- Provide Mat'l Handling and Installation Support for Phase I of Inj. Upgrade
- PSS Injector Segment PLC Upgrade
- Injector Camac to Vme and camera upgrade
- Pedestal Location Surveys
- Install Chopper SSA's
- Chopper SSA LCW
- Penetration Drops
- Testing Wien HV Controls at UITF
- Accelerator network re-survey
- Remove and re-install BPM's Gun to chopper
- Install new IPM2I03
- Remove and calibrate current monitoring electronics
- Harp work
- RSRSRC
- New Gun2 loading chamber
- Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard