Difference between revisions of "CIS Safety"

From Ciswikidb
Jump to navigation Jump to search
Line 32: Line 32:
 
===CEBAF Specific OSPs, TOSPs and LOSPs===
 
===CEBAF Specific OSPs, TOSPs and LOSPs===
 
These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
 
These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
* CEBAF Injector Laser Cleanroom (ACC-18-76974-LOSP), valid through 5/26/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=76974
+
 
* CEBAF Injector Laser System (ACC-19-94369-LOSP), valid through 10/31/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94369
 
 
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
 
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
 +
 
* CEBAF gun HV processing without Accelerator Injector segment PSS[https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=152257 CEBAF gun HV processing without Accelerator Injector segment PSS valid through 3-20-3026]
 
* CEBAF gun HV processing without Accelerator Injector segment PSS[https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=152257 CEBAF gun HV processing without Accelerator Injector segment PSS valid through 3-20-3026]
  
 
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP)  : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
 
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP)  : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
 +
 
* Wien filter high voltage measurement using voltage divider box (ACC-20-108912-OSP), valid through 11/19/2023: [https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=108912** [[Media:operational_safety_procedure_form_108912.pdf]]]
 
* Wien filter high voltage measurement using voltage divider box (ACC-20-108912-OSP), valid through 11/19/2023: [https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=108912** [[Media:operational_safety_procedure_form_108912.pdf]]]
  

Revision as of 12:11, 16 June 2023

LOTO Restart Process for OSP/LOSP/TOSP work control documents

SLAC Electrical Shock Discussion and JLAB LOTO Restart Process

SF6 Systems Operated as a Pressure Vessel

SF6 Systems NOT Operated as a Pressure Vessel

CEBAF Specific OSPs, TOSPs and LOSPs

These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

LERF Specific



GTS Specific

Official documents managed via document-control for CEBAF

Other documents NOT managed via document-control