* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP)  : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
 
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP)  : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
  
===Official documents managed via document-control for CEBAF===
+
== Official documents managed via document-control for CEBAF ==
  
 
* CEBAF accelerator MEDCON 5 loading limits (IH1000-04g), circulated S. Hoey 9/29/20: [[media:loading limits_CEBAF ih1000004g_v4.docx]]
 
* CEBAF accelerator MEDCON 5 loading limits (IH1000-04g), circulated S. Hoey 9/29/20: [[media:loading limits_CEBAF ih1000004g_v4.docx]]
Line 63: Line 63:
 
* TL1137 MicroMott Polarimeter Operation Approved July 2020 Expires Aug 2023 https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103187
 
* TL1137 MicroMott Polarimeter Operation Approved July 2020 Expires Aug 2023 https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103187
  
===Other documents NOT managed via document-control===
+
== Other documents NOT managed via document-control ==
  
 
* SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory
 
* SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory
 
* Task Hazard Analysis for NEG sputter coating [[media:THA_NEGSputtering.docx]]
 
* Task Hazard Analysis for NEG sputter coating [[media:THA_NEGSputtering.docx]]
 
* NFPA posting for chambers containing NEG materials from Jennifer Williams [[media:NEG component_ nfpa.docx]]
 
* NFPA posting for chambers containing NEG materials from Jennifer Williams [[media:NEG component_ nfpa.docx]]

Revision as of 12:26, 16 June 2023

LOTO Restart Process for OSP/LOSP/TOSP work control documents

SLAC Electrical Shock Discussion and JLAB LOTO Restart Process

SF6 Systems

Operated as a Pressure Vessel

NOT Operated as a Pressure Vessel

CIS Specific OSPs

Active

6/16/23 - complete list by ACC division => media:Accelerator OSPs 20230616-CIS.xlsx

Draft

Incomplete or another group

Official documents managed via document-control for CEBAF

Other documents NOT managed via document-control