Difference between revisions of "CIS Safety"

From Ciswikidb
Jump to navigation Jump to search
Line 51: Line 51:
  
 
* GTS operations OSP, valid through11/23/2025:[[File:GTS OSP 2022 fully signed off.pdf|right|middle|thumb]]
 
* GTS operations OSP, valid through11/23/2025:[[File:GTS OSP 2022 fully signed off.pdf|right|middle|thumb]]
* GTS HVPS OSP including LOTO procedures valid through11/4/2023:[[File:GTS HVPS OSP Nov 2022 Complex LOTO signed off.pdf|right|middle|thumb]]
+
* [https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?ENTRY_ID=144152 GTS HVPS OSP including LOTO procedures valid through11/4/2023]<br  />
  
 
===Official documents managed via document-control for CEBAF===
 
===Official documents managed via document-control for CEBAF===

Revision as of 11:10, 15 June 2023

SLAC Electrical Shock Discussion and JLAB LOTO Restart Process

SF6 Systems Operated as a Pressure Vessel

  • CEBAF SF6 HVPS pressure vessel - ASME 100 psihttps://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417

SF6 Systems NOT Operated as a Pressure Vessel

CEBAF Specific OSPs, TOSPs and LOSPs

These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

LERF Specific



GTS Specific

Official documents managed via document-control for CEBAF

Other documents NOT managed via document-control