Difference between revisions of "CIS Safety"

From Ciswikidb
Jump to navigation Jump to search
Line 14: Line 14:
 
* UITF SF6 HVPS pressure vessel - ASME 100 psi: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-25492(complete, w/ tank drawings): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867
 
* UITF SF6 HVPS pressure vessel - ASME 100 psi: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-25492(complete, w/ tank drawings): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867
  
* DILO SF6 Transfer and Recovery Cart (2019 unit)(original) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49572Alteration #1 - SF6 10 psi R28 resistor tank: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49570
+
* DILO SF6 Transfer and Recovery Cart (2019 unit)(original) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49572Alteration #1 - SF6 10 psi R28 resistor tank: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49570Alteration #2 - 500 kV SF6 10 psi HV chamber: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49571
*: Alteration #2 - 500 kV SF6 10 psi HV chamber: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49571
 
  
* DILO SF6 Transfer and Recovery Cart (2013 unit)(original): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-19051(copy of 19051 but with two alterations): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-22091
+
* DILO SF6 Transfer and Recovery Cart (2013 unit)(original): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-19051(copy of 19051 but with two alterations): https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-22091Alteration #1 - SF6 10 psi R28 resistor tank: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49570
*: Alteration #1 - SF6 10 psi R28 resistor tank: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49570
 
 
*: Alteration #2 - 500 kV SF6 10 psi HV chamber: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49571
 
*: Alteration #2 - 500 kV SF6 10 psi HV chamber: https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-49571
  

Revision as of 11:02, 16 June 2023

LOTO Restart Process for OSP/LOSP/TOSP work control documents

SLAC Electrical Shock Discussion and JLAB LOTO Restart Process

SF6 Systems Operated as a Pressure Vessel

SF6 Systems NOT Operated as a Pressure Vessel

CEBAF Specific OSPs, TOSPs and LOSPs

These procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

LERF Specific



GTS Specific

Official documents managed via document-control for CEBAF

Other documents NOT managed via document-control