CEBAF Injector Upgrade
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
The Injector Upgrade wiki begins here.
Quick Links
- Daily 8:00am + Wed 1:30 MCC => https://bluejeans.com/569476853
- Daily 8:30am toolbox => https://bluejeans.com/171126028
- Schedule media:200918_AIPINJ_Schedule.pdf (weekly details here CIS Phase 1 work plans)
Planning, planning, planning...
- Phase 1 Planning ATLIS
- CIS Phase 1 work plans
- AIPINJ - Phase 1 and 2 Schedule
- AIPINJ - Layouts
- AIPINJ - S&A Transmittals
- AIPINJ - Upgrade Meetings
- 3D cad and released drawings on AIPINJ OneDrive Folder
Major Phase 1 Beamline Components
- 200 kV gun - Cathode, anode and high voltage system
- 200 kV NEG Coated BPM's - New BPM's on beam pipe, NEG coated and absolutely mapped
- DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
- FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
- PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker of reliable design to operate at 200 kV with shorter throw
- WF Wien Filters (200 kV upgrade) - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
- QW Wien quadrupoles (200 kV upgrade) - New quads designed for 200 keV energy, w/ improved magnetic field quality
- Chopping System (200 kV upgrade) - Choppers get higher power amplifiers, maybe a new chopping chamber
- Pre-buncher cavity (200 kV upgrade) - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
- NEG coated 2.5 inch OD BPM's - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
- HD steering coils - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy
- A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
- Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps
Major Phase 2 Beamline Components
ATLIS Tasks
- AIPINJ
- Removal of PSS kicker magnet injector segment
- Mat'l Handling and Installation for Phase I of Inj. Upgrade
- Pedestal Location Surveys
- Install Chopper SSA's
- Chopper SSA LCW
- Penetration Drops
- Remove and re-install BPM's Gun to chopper
- Install new IPM2I03
- Remove and calibrate current monitoring electronics
- Harp work
- Testing Wien HV Controls at UITF
- CIS SAD Tasks
- New Gun2 loading chamber
- Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
- Fix IHWP readback during SAD
- Injector Related SAD Tasks
- PSS Injector Interface Chassis removal
- PSS Injector Segment PLC Upgrade
- PSS Injector Interface Chassis removal
- I&C Injector Camac to Vme and camera upgrade
- I&C Upgrade harps to PC104
- I&C Upgrade existing ItoV System with ItoV VME cards
- I&C Accelerator network re-survey
- FAC Tunnel Fire Alarm and Suppression Replacement