CEBAF Injector Upgrade
The Injector Upgrade wiki begins here.
Quick Links
- Daily 8:00am + Wed 1:30 MCC => https://bluejeans.com/569476853
- Daily 8:30am toolbox => https://bluejeans.com/171126028
- Schedule media:200918_AIPINJ_Schedule.pdf (weekly details here CIS Phase 1 work plans)
Planning, planning, planning...
- Phase 1 Planning ATLIS
- CIS Phase 1 work plans
- AIPINJ - Phase 1 and 2 Schedule
- AIPINJ - Layouts
- AIPINJ - S&A Transmittals
- AIPINJ - Upgrade Meetings
- 3D cad and released drawings on AIPINJ OneDrive Folder
Major Phase 1 Beamline Components
- 200 kV gun - Cathode, anode and high voltage system
- 200 kV NEG Coated BPM's - New BPM's on beam pipe, NEG coated and absolutely mapped
- DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
- FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
- PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker of reliable design to operate at 200 kV with shorter throw
- WF Wien Filters (200 kV upgrade) - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
- QW Wien quadrupoles (200 kV upgrade) - New quads designed for 200 keV energy, w/ improved magnetic field quality
- Chopping System (200 kV upgrade) - Choppers get higher power amplifiers, maybe a new chopping chamber
- Pre-buncher cavity (200 kV upgrade) - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
- NEG coated 2.5 inch OD BPM's - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
- HD steering coils - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy
- A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
- Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps
Major Phase 2 Beamline Components
ATLIS Tasks
- AIPINJ
- Removal of PSS kicker magnet injector segment
- Mat'l Handling and Installation for Phase I of Inj. Upgrade
- Pedestal Location Surveys
- Install Chopper SSA's
- Chopper SSA LCW
- Penetration Drops
- Remove and re-install BPM's Gun to chopper
- Install new IPM2I03
- Remove and calibrate current monitoring electronics
- Harp work
- Testing Wien HV Controls at UITF
- CIS SAD Tasks
- New Gun2 loading chamber
- Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
- Fix IHWP readback during SAD
- Injector Related SAD Tasks
- PSS Injector Interface Chassis removal
- PSS Injector Segment PLC Upgrade
- PSS Injector Interface Chassis removal
- I&C Injector Camac to Vme and camera upgrade
- I&C Upgrade harps to PC104
- I&C Upgrade existing ItoV System with ItoV VME cards
- I&C Accelerator network re-survey
- FAC Tunnel Fire Alarm and Suppression Replacement