Line 3: Line 3:
 
=== Schedule (Joe) ===
 
=== Schedule (Joe) ===
 
* [http://opsweb.acc.jlab.org/TJ3/12GeV_CEBAF/SSAD2016.html Summer SAD]  
 
* [http://opsweb.acc.jlab.org/TJ3/12GeV_CEBAF/SSAD2016.html Summer SAD]  
 +
** Apr 06 - Apr 27 : Halls A/B/D
 +
** Apr 27 - May 13 : Mini-down for Open House, PSS Cert : Install new RTP driver on Hall A laser for testing
 +
** May 13 - Jun 27 : PRAD / Bubble runs
 +
* Phase I : Jun 27 – July 25
 +
**Construct 4th laser, modify laser table for 4-beam combination, include new EO pulse scheme
 +
**Install 4-beam SCAM, laser macro-pulse chassis, PSS laser shutter chassis
 +
**INJ lock-ups TBD for commissioning
 +
*Phase II : Jul 26 – Aug 19
 +
**Contingency for Phase I
 +
**Replace 3-channel VME SRF-style digital LLRF with 4-channel PC104 laser dedicated digital LLRF w/ 250/499
 +
**INJ and INJ/NL lock-ups TBD for commissioning
  
 
=== Laser Status (John) ===
 
=== Laser Status (John) ===
Line 18: Line 29:
  
 
=== LLRF (Tomasz) ===
 
=== LLRF (Tomasz) ===
* Implementation timeline
+
* March 14 - Draft of source requirements circulated [[media:LLRF-Source_v1.docx]]
 +
Implementation timeline

Revision as of 12:17, 5 April 2016

We will meet Wed April 6 @ 11am in TL-1227 for monthly status update.

Schedule (Joe)

  • Summer SAD
    • Apr 06 - Apr 27 : Halls A/B/D
    • Apr 27 - May 13 : Mini-down for Open House, PSS Cert : Install new RTP driver on Hall A laser for testing
    • May 13 - Jun 27 : PRAD / Bubble runs
  • Phase I : Jun 27 – July 25
    • Construct 4th laser, modify laser table for 4-beam combination, include new EO pulse scheme
    • Install 4-beam SCAM, laser macro-pulse chassis, PSS laser shutter chassis
    • INJ lock-ups TBD for commissioning
  • Phase II : Jul 26 – Aug 19
    • Contingency for Phase I
    • Replace 3-channel VME SRF-style digital LLRF with 4-channel PC104 laser dedicated digital LLRF w/ 250/499
    • INJ and INJ/NL lock-ups TBD for commissioning

Laser Status (John)

  • Status

SCAM-II (Roger)

  • March
    • Additional input from Kevin Jordan and Michael Tiefenback collected.
    • Grames met with Injector group, solicited pre-draft input
    • March 31st - Version 1 draft circulated media:SAMII_v1.docx to Flood, Hansknecht, Robertson, Higgins
  • April
    • Hansknecht and Robertson provided feedback
    • Flood/Grames reviewed feedback and refined document punch list
    • April 5th - Version 2 draft media:SAMII_v2.docx circulated to larger group for review

LLRF (Tomasz)

Implementation timeline