Difference between revisions of "Bubble Chamber Meeting Wednesday January 20, 2016"

From Ciswikidb
Jump to navigation Jump to search
Line 35: Line 35:
  
  
* My statement [https://wiki.jlab.org/ciswiki/index.php/Bubble_Chamber_Meeting_Wednesday_November_11,_2015 here] about beam energy being 5% lower than set value is not correct. Complete analysis of the beam energy measurements is forthcoming.
+
* My statement [https://wiki.jlab.org/ciswiki/index.php/Bubble_Chamber_Meeting_Wednesday_November_11,_2015] about beam energy being 5% lower than set value is not correct. Complete analysis of the beam energy measurements is forthcoming.

Revision as of 08:51, 20 January 2016

We will meet in TL 2221 on Wednesday January 20 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Moderator Passcode: 5978#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- GEANT4 Simulation:

  1. Gamma Flux: media:G4Flux_Sept2015.pdf media:G4Flux_Sept2015.pptx
  2. Expected Rates:
    1. 18O(γ,α)14C with no ThrCut: media:O18ga_rate_G4.txt
    2. 17O(γ,n)16O with:
      1. ThrCut = 90 keV: media:O17gn_rate_G4_90keV.txt
      2. ThrCut = 130 keV: media:O17gn_rate_G4_130keV.txt
    3. 14N(γ,p)13C with:
      1. ThrCut = 20 keV: media:N14gp_rate_G4_20keV.txt
      2. ThrCut = 50 keV: media:N14gp_rate_G4_50keV.txt


2- Sept beam test data analysis: media:Analyses_Rashi_Jan2016.pdf media:Analyses_Rashi_Jan2016.pptx

3- Bubble Chamber work at ANL

4- Discussion of June 2016 beam test

5- New beamline design with sweep magnet




  • My statement [2] about beam energy being 5% lower than set value is not correct. Complete analysis of the beam energy measurements is forthcoming.