Difference between revisions of "CIS Safety"

From Ciswikidb
Jump to navigation Jump to search
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
==Spring 2023 Safety Pause==
 
==Spring 2023 Safety Pause==
 
===High Hazard Restart Process===
 
===High Hazard Restart Process===
 
 
* [https://jeffersonlab.sharepoint.com/sites/AccSafetyPauseJune2023/Shared%20Documents/Forms/AllItems.aspx Sharepoint Link]
 
* [https://jeffersonlab.sharepoint.com/sites/AccSafetyPauseJune2023/Shared%20Documents/Forms/AllItems.aspx Sharepoint Link]
 
* [https://misportal.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm?search_type=OSP&search_current_only=true&search= OSP Query Form]
 
* [https://misportal.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm?search_type=OSP&search_current_only=true&search= OSP Query Form]
 
 
===LOTO Restart Process for OSP/LOSP/TOSP work control documents===
 
===LOTO Restart Process for OSP/LOSP/TOSP work control documents===
 
 
* [[media:HEC Restart Process 052323 draft final.pdf]]
 
* [[media:HEC Restart Process 052323 draft final.pdf]]
 
* [[media:HEC Restart Checklist 052323 draft final.pdf]]
 
* [[media:HEC Restart Checklist 052323 draft final.pdf]]
  
===SLAC Electrical Shock Discussion and JLAB LOTO Restart Process===
+
===SLAC Electrical Shock Discussion and JLAB LOTO Restart Process ===
 
 
 
* [[media:SLAC Electrical Shock Accident Investigation Report - Final.pdf]]
 
* [[media:SLAC Electrical Shock Accident Investigation Report - Final.pdf]]
 
* [https://www.jlab.org/video/slac-electrical-event-discussion Video of SLAC electrical event discussion, May 19, 2023]
 
* [https://www.jlab.org/video/slac-electrical-event-discussion Video of SLAC electrical event discussion, May 19, 2023]
Line 30: Line 26:
 
* LERF Gun High Voltage Conditioning OSP, valid through 11/10/2021 [[Media:LERF gun OSP HV conditioning_80619_signed-off.pdf]]
 
* LERF Gun High Voltage Conditioning OSP, valid through 11/10/2021 [[Media:LERF gun OSP HV conditioning_80619_signed-off.pdf]]
  
===Draft===
+
=== Draft ===
 
 
 
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
 
* CEBAF Battery Bias Box, Draft OSP [[media:DraftOSP_Battery_bias_box_maintenance.docx]] and Task Hazard Analysis [[media:draftTHA_battery_bias_box_maintenance.docx]]
  
Line 37: Line 32:
  
 
===Incomplete or another group===
 
===Incomplete or another group===
 
 
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP)  : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
 
* DC Power OSP De-energizing 10 Amp Trim Rack with application of Lock, Tag and Try (LT&T) at CEBAF, LERF, UITF, GTS (ENG-20-103293-OSP)  : https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103293
  
Line 65: Line 59:
 
** LERF Description of HVPS SF6 vessel and gas flow [[Media:LERF-FEL SF6 transfer system overview documented September 2021.pptx]]
 
** LERF Description of HVPS SF6 vessel and gas flow [[Media:LERF-FEL SF6 transfer system overview documented September 2021.pptx]]
  
==Official documents managed via document-control for CEBAF==
+
== Official documents managed via document-control for CEBAF ==
  
 
* CEBAF accelerator MEDCON 5 loading limits (IH1000-04g), circulated S. Hoey 9/29/20: [[media:loading limits_CEBAF ih1000004g_v4.docx]]
 
* CEBAF accelerator MEDCON 5 loading limits (IH1000-04g), circulated S. Hoey 9/29/20: [[media:loading limits_CEBAF ih1000004g_v4.docx]]
Line 71: Line 65:
 
* CEBAF Injector Power Supply SF6 Tank & 350 kV Receptacle (PS-ACC-17-001) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
 
* CEBAF Injector Power Supply SF6 Tank & 350 kV Receptacle (PS-ACC-17-001) https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417
 
* CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
 
* CEBAF Industrial Hygiene Assessment for SF6 exposure evaluated June 2018 by Jennifer Williams : requested link to official assessment
* TL1137 MicroMott Polarimeter Operation Approved July 2020 Expires Aug 2023 <a href="https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103187">https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=103187</a> media:MicroMottOSP.pdf<br  />
+
* TL1137 MicroMott Polarimeter Operation approved Aug 2023 https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=161272
 +
 
  
==Other documents NOT managed via document-control==
+
== Other documents NOT managed via document-control ==
  
 
* SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory
 
* SF6 Inventory log and calculation sheets are located at:O:\inj_group\SF6 Gas Management and Inventory
 
* Task Hazard Analysis for NEG sputter coating [[media:THA_NEGSputtering.docx]]
 
* Task Hazard Analysis for NEG sputter coating [[media:THA_NEGSputtering.docx]]
 
* NFPA posting for chambers containing NEG materials from Jennifer Williams [[media:NEG component_ nfpa.docx]]
 
* NFPA posting for chambers containing NEG materials from Jennifer Williams [[media:NEG component_ nfpa.docx]]

Latest revision as of 16:53, 10 January 2024

Spring 2023 Safety Pause

High Hazard Restart Process

LOTO Restart Process for OSP/LOSP/TOSP work control documents

SLAC Electrical Shock Discussion and JLAB LOTO Restart Process

CIS Specific OSPs

Submitted

6/16/23 - complete list by ACC division => media:Accelerator OSPs 20230616-CIS.xlsx

Draft

Incomplete or another group

SF6 Systems

Operated as a Pressure Vessel

NOT Operated as a Pressure Vessel

Official documents managed via document-control for CEBAF


Other documents NOT managed via document-control