- 07:47, 11 April 2022 diff hist +43 Update meetings
- 07:03, 6 April 2022 diff hist +94 April 6, 2022 - HV chamber ME jobs current
- 14:49, 5 April 2022 diff hist 0 N File:High current polarized gun for positrons - slides for April 6 2022 meeting.pptx current
- 14:49, 5 April 2022 diff hist +62 PPB - Apr 6, 2022 →Agenda Mar 30, 2022
- 14:51, 4 April 2022 diff hist 0 N File:DecaRad locations Nb T shape electrode on white R28 right view.png current
- 14:51, 4 April 2022 diff hist 0 N File:Beamline gun to Y-chamber side view.JPG current
- 14:50, 4 April 2022 diff hist +129 Anode flange prints and pictures
- 14:13, 4 April 2022 diff hist -1 Update meetings
- 14:02, 4 April 2022 diff hist 0 N File:Anode flange hogged out pic01.jpg current
- 14:02, 4 April 2022 diff hist 0 N File:Anode flange hogged out pic02.jpg current
- 14:02, 4 April 2022 diff hist 0 N File:ACC2003000-0336, LOAD LOCK GUN H.V. CHAMBER U.S. FLANGE, REV-.pdf current
- 14:01, 4 April 2022 diff hist 0 N File:ARC19325.pdf current
- 14:01, 4 April 2022 diff hist +86 Anode flange prints and pictures
- 14:00, 4 April 2022 diff hist +219 N Anode flange prints and pictures Created page with "'''Prints''' *Media:ARC19325.pdf *Media:ACC2003000-0336, LOAD LOCK GUN H.V. CHAMBER U.S. FLANGE, REV-.pdf '''Pictures''' *Media:Anode flange hogged out pic02.jpg..."
- 13:58, 4 April 2022 diff hist -35 April 6, 2022 - HV chamber ME jobs
- 13:58, 4 April 2022 diff hist +75 April 6, 2022 - HV chamber ME jobs
- 13:51, 4 April 2022 diff hist +527 N April 6, 2022 - HV chamber ME jobs Created page with "==Agenda== # Anode assembly prints update from Shaun # Anode flange discussion # HV chamber feet discussion #* CEBAF HV chamber centerline is 13-3/4" above table #* UITF HV c..."
- 13:46, 4 April 2022 diff hist +62 Update meetings
- 09:14, 1 April 2022 diff hist +95 Gun assemblies, electrostatic models and field maps
- 09:12, 1 April 2022 diff hist -15 Designs
- 09:10, 1 April 2022 diff hist 0 N File:Tee electrode manufacturing drawing two piece body.pdf current
- 09:10, 1 April 2022 diff hist +197 Designs →Gun Designs
- 09:04, 1 April 2022 diff hist 0 N File:HV chamber gun 14" diameter drawing.pdf current
- 09:03, 1 April 2022 diff hist +50 Designs
- 09:40, 31 March 2022 diff hist +486 18" Photogun ala GTS
- 09:38, 31 March 2022 diff hist +192 Presentations current
- 09:38, 31 March 2022 diff hist -195 18" Photogun ala GTS
- 09:38, 31 March 2022 diff hist -903 18" Photogun ala GTS
- 09:38, 31 March 2022 diff hist +94 Presentations
- 09:37, 31 March 2022 diff hist +903 N Presentations Created page with "* 03/30/2021 Simulation of the anode tube for 6 and 12-slots Media: R30-3_SLOTS.pptx * 03/02/2021 Simulation of the anode hinge. Shaun's latest model, FINER MESH Media:..."
- 09:36, 31 March 2022 diff hist +50 18" Photogun ala GTS
- 11:16, 28 March 2022 diff hist +146 Mar 29, 2022 - Update Meeting current
- 11:05, 28 March 2022 diff hist -6 Mar 29, 2022 - Update Meeting
- 11:04, 28 March 2022 diff hist +449 N Mar 29, 2022 - Update Meeting Created page with "==Agenda== 1. Target timeframe to have the gun installed in UITF is early June 2. Update from Shaun on anode assembly prints. 3. Priorities for ME 3.1 NEG screens: what is n..."
- 10:59, 28 March 2022 diff hist +52 Update meetings
- 08:33, 22 March 2022 diff hist +98 Mar 23, 2022 - Update Meeting current
- 08:31, 22 March 2022 diff hist +235 N Mar 23, 2022 - Update Meeting Created page with "==Agenda== * NEG screens * HV chamber * Layouts for installing HV chamber in UITF and in CEBAF * [https://jlab-org.zoomgov.com/j/1617282949?pwd=ZDBoQXc0UWw3S01WQzZOYXFRb29Bdz0..."
- 08:28, 22 March 2022 diff hist +52 Update meetings
- 13:14, 21 March 2022 diff hist +159 Gun assemblies, electrostatic models and field maps
- 11:43, 17 March 2022 diff hist +34 Mar 17, 2022 - Update Meeting current
- 11:43, 17 March 2022 diff hist +45 Mar 17, 2022 - Update Meeting
- 11:39, 17 March 2022 diff hist +146 Mar 17, 2022 - Update Meeting
- 11:36, 17 March 2022 diff hist +247 Mar 17, 2022 - Update Meeting
- 09:11, 17 March 2022 diff hist +500 Mar 17, 2022 - Update Meeting
- 08:52, 17 March 2022 diff hist 0 N File:Electrode ball after 950 C for 6 hours vacuum degassing.jpg current
- 08:51, 17 March 2022 diff hist 0 N File:Electrodes in containers after 950 C vacuum degassing.jpg current
- 08:51, 17 March 2022 diff hist +345 Mar 17, 2022 - Update Meeting
- 08:08, 17 March 2022 diff hist 0 N File:InjElectDeg950 6hrs 031522 1040 data plot.jpg current
- 08:08, 17 March 2022 diff hist +173 Mar 17, 2022 - Update Meeting
- 10:17, 16 March 2022 diff hist 0 N File:Tilted anode and tube with 12 and with 6 slots.png current
- 10:17, 16 March 2022 diff hist +2 Mar 17, 2022 - Update Meeting
- 10:16, 16 March 2022 diff hist +189 Mar 17, 2022 - Update Meeting
- 10:12, 16 March 2022 diff hist +110 Mar 17, 2022 - Update Meeting
- 10:11, 16 March 2022 diff hist +84 Mar 17, 2022 - Update Meeting
- 10:09, 16 March 2022 diff hist +153 Mar 17, 2022 - Update Meeting
- 10:08, 16 March 2022 diff hist +548 N Mar 17, 2022 - Update Meeting Created page with "==Agenda== * NEG screens - Marcy * Gun table layouts (UITF, CEBAF) - Shaun * Anode tube versions ** Shaun sent Gabriel models for the 12 narrow and for the 6 wide slot tubes *..."
- 10:02, 16 March 2022 diff hist +52 Update meetings
- 15:04, 10 March 2022 diff hist -76 Update meetings
- 14:04, 10 March 2022 diff hist 0 N File:High current polarized gun schedule + labor estimates Rev01.xlsx current
- 14:03, 10 March 2022 diff hist +77 Update meetings
- 09:06, 10 March 2022 diff hist +94 March 10 2022: Disscussion with SRF production team to install electrode in clnrm current
- 09:04, 10 March 2022 diff hist 0 N File:Current gun aassembly and proposed final step in SRF clnrm.pptx current
- 09:04, 10 March 2022 diff hist +576 N March 10 2022: Disscussion with SRF production team to install electrode in clnrm Created page with "* We are considering lowering the electrode-insulator assembly into the gun HV chamber as the last step, but in the SRF production clean room, instead of in the tunnel or in t..."
- 08:58, 10 March 2022 diff hist +125 Update meetings
- 08:57, 10 March 2022 diff hist +93 Update meetings
- 08:56, 10 March 2022 diff hist +6 N Update meetings Created page with "* test"
- 08:55, 10 March 2022 diff hist +7 18" Photogun ala GTS
- 08:54, 10 March 2022 diff hist +60 18" Photogun ala GTS
- 16:45, 4 March 2022 diff hist +8 Electrostatic and beam dynamics simulations →R30-3:
- 15:56, 28 February 2022 diff hist 0 N File:Bubba and Ben dry fitting the electrode 03.jpg current
- 15:56, 28 February 2022 diff hist -83 Electrode current
- 15:18, 28 February 2022 diff hist +80 Anode current
- 15:04, 28 February 2022 diff hist 0 N File:200kV Gun w-CIS-ASY-R30-3 (2) iso.png current
- 15:04, 28 February 2022 diff hist +50 18" Photogun ala GTS
- 14:48, 28 February 2022 diff hist +152 CIS-ASY-R30-3 current
- 14:47, 28 February 2022 diff hist +62 CIS-ASY-R30-3
- 10:30, 25 February 2022 diff hist +1 Glassman High Voltage Power Supplies →UITF 350 kV 4.5 mA current
- 10:29, 25 February 2022 diff hist -1 Glassman High Voltage Power Supplies →CEBAF 450 kV 3.0 mA
- 10:49, 23 February 2022 diff hist 0 N File:DRAFT CIS-ASY-R30-3 build schedule.xlsx current
- 10:49, 23 February 2022 diff hist +52 Tasks current
- 12:22, 8 February 2022 diff hist 0 N File:Anode tracker CIS-ASY-R30-3 18" 200 kV updated 02-08-22.xlsx current
- 12:22, 8 February 2022 diff hist 0 N File:Carlos notes on biased anode CEBAF gun tube grounded.pdf current
- 12:21, 8 February 2022 diff hist 0 N File:Carlos notes on drawing anode cathode gap 6 cm like CEBAF.pdf current
- 12:21, 8 February 2022 diff hist +141 Anode
- 12:18, 8 February 2022 diff hist +72 Anode
- 16:24, 1 February 2022 diff hist -41 Anode
- 16:23, 1 February 2022 diff hist +1 Anode
- 16:22, 1 February 2022 diff hist 0 N File:Anode findings Jan 31 2022.pdf current
- 16:22, 1 February 2022 diff hist +40 Anode
- 16:20, 1 February 2022 diff hist -42 Anode
- 16:20, 1 February 2022 diff hist +44 Anode
- 16:19, 1 February 2022 diff hist -2 Anode
- 16:18, 1 February 2022 diff hist 0 N File:Anode tracker CIS-ASY-R30-3 18" 200 kV updated 02-01-22.xlsx current
- 16:18, 1 February 2022 diff hist 0 N File:Anode findings Jan 31 2022.docx current
- 16:17, 1 February 2022 diff hist -942 Anode
- 12:03, 10 January 2022 diff hist +12 CIS Conference and Workshop Proceedings
- 10:09, 10 January 2022 diff hist +331 CIS Conference and Workshop Proceedings
- 18:03, 6 January 2022 diff hist +1 CIS Presentations →2022
- 18:02, 6 January 2022 diff hist +208 CIS Presentations →2022
- 08:51, 4 January 2022 diff hist +16 CIS Conference and Workshop Proceedings
- 08:51, 4 January 2022 diff hist -553 CIS Conference and Workshop Proceedings →2021
- 08:49, 4 January 2022 diff hist 0 N File:Inv insulators paper published 2021 IEEE conf on elec insu and deil phenomena.pdf current
- 08:49, 4 January 2022 diff hist +476 CIS Conference and Workshop Proceedings →2021
- 11:32, 20 December 2021 diff hist +27 CIS-ASY-R30-3
- 11:31, 20 December 2021 diff hist +3 CIS-ASY-R30-2 current
- 11:30, 20 December 2021 diff hist +189 CIS-ASY-R30-3
- 11:22, 20 December 2021 diff hist +427 N CIS-ASY-R30-3 Created page with "* 18" HV chamber NEG coated and originally built with WP NEG modules and wire mesh screen * 10" CF flange vacuum fired * R30 pure alumina insulator * Spherical electrode * Pie..."
- 10:56, 20 December 2021 diff hist 0 N File:ACC-200-3000-0460 SPHERICAL ELECTRODE SHELL S&A annotated.pdf current
- 10:56, 20 December 2021 diff hist +72 CIS-ASY-R30-1 current
- 10:55, 20 December 2021 diff hist +118 CIS-ASY-R30-2
- 10:54, 20 December 2021 diff hist +70 CIS-ASY-R30-2
- 10:53, 20 December 2021 diff hist -69 CIS-ASY-R30-1
- 16:13, 17 December 2021 diff hist +41 CIS-ASY-R30-1
- 16:12, 17 December 2021 diff hist 0 N File:Vacuum Chamber Drawing.pdf current
- 16:11, 17 December 2021 diff hist -16 CIS-ASY-R30-1
- 16:10, 17 December 2021 diff hist 0 N File:GTS gun chamber 2D drawing by Gary Hays.pdf current
- 16:09, 17 December 2021 diff hist -9 CIS-ASY-R30-1
- 16:08, 17 December 2021 diff hist -9 CIS-ASY-R30-1
- 16:07, 17 December 2021 diff hist +226 CIS-ASY-R30-1
- 15:44, 17 December 2021 diff hist 0 N File:Ball Electrode Drawing marked up by Carlos Dec 16 2021.pdf current
- 15:44, 17 December 2021 diff hist +70 CIS-ASY-R30-1
- 15:39, 17 December 2021 diff hist +1 CIS-ASY-R30-1
- 15:38, 17 December 2021 diff hist 0 N File:Anode plate John's design.jpg current
- 15:38, 17 December 2021 diff hist +41 CIS-ASY-R30-1
- 15:37, 17 December 2021 diff hist +41 CIS-ASY-R30-1
- 15:26, 17 December 2021 diff hist 0 N File:350kV Gun with Guts blue puck.jpg current
- 15:26, 17 December 2021 diff hist +43 CIS-ASY-R30-1
- 14:40, 14 December 2021 diff hist +8 CIS-ASY-R30-2
- 16:21, 10 December 2021 diff hist +363 N CIS-ASY-R30-2 Created page with " 18" HV chamber with NEG strips 10" CF flange vacuum fired with holes for S&A tooling R30 pure alumina insulator Spherical electrode FLAT geometry electrode front end 6" anode..."
- 15:27, 10 December 2021 diff hist +38 Gun assemblies, electrostatic models and field maps →Ball Electrode Assemblies on R30 insulators in 18" diameter vacuum chamber
- 15:27, 10 December 2021 diff hist +120 CIS-ASY-R30-1
- 15:24, 10 December 2021 diff hist +86 CIS-ASY-R30-1
- 15:22, 10 December 2021 diff hist +101 CIS-ASY-R30-1
- 15:19, 10 December 2021 diff hist +339 N CIS-ASY-R30-1 Created page with " *18" HV chamber with WP NEG modules and perforated shield screen *10" CF flange vacuum fired and engraved with CIS-ASY-R30-1 reference *R30 doped alumina insulator *Spherical..."
- 15:18, 10 December 2021 diff hist +132 Gun assemblies, electrostatic models and field maps
- 10:07, 7 December 2021 diff hist +82 CIS-ASY-R28-4 current
- 10:06, 7 December 2021 diff hist -22 CIS-ASY-R28-4
- 10:05, 7 December 2021 diff hist 0 N File:R28 assemblies with small shield and doped alumina stored in TL1137.jpg current
- 10:05, 7 December 2021 diff hist +132 CIS-ASY-R28-3 current
- 09:58, 7 December 2021 diff hist -42 CIS-ASY-R28-3
- 09:58, 7 December 2021 diff hist +1 CIS-ASY-R28-3
- 09:58, 7 December 2021 diff hist 0 CIS-ASY-R28-3
- 09:56, 7 December 2021 diff hist +41 CIS-ASY-R28-3
- 09:56, 7 December 2021 diff hist -41 CIS-ASY-R28-3
- 09:55, 7 December 2021 diff hist +41 CIS-ASY-R28-3
- 09:54, 7 December 2021 diff hist +98 CIS-ASY-R28-3 →Electrode with small triple junction shield configuration mounted on black R28 insulator and vacuum fired flange. Installed in UITF gun, operational at 200kV for regular beam ops
- 09:30, 7 December 2021 diff hist +6 CIS-ASY-R28-1 →T-shape, large grain Nb electrode mounted on white R28 insulator and vacuum fired flange. Stored in the cabinet next to clean room in TL1137
- 13:09, 1 December 2021 diff hist 0 N File:CEBAF QE cathode scan procedure.docx current
- 13:08, 1 December 2021 diff hist +62 CIS OnCall and Troubleshooting
- 15:53, 16 November 2021 diff hist 0 N File:Gabriel's analysis 18"gun with CEBAF anode Shields.pdf current
- 15:53, 16 November 2021 diff hist +67 Nov 16, 2021 - Group meeting current
- 15:47, 16 November 2021 diff hist +4 Nov 16, 2021 - Group meeting
- 15:45, 16 November 2021 diff hist 0 N File:Angled anode 6 2020 2 vs shifted anode analysis by Sajini for GTS gun.pdf current
- 15:45, 16 November 2021 diff hist +58 Nov 16, 2021 - Group meeting
- 15:44, 16 November 2021 diff hist +24 Nov 16, 2021 - Group meeting
- 15:41, 15 November 2021 diff hist 0 N File:HV Receptacles Inventory updated Nov 15 2021.png current
- 15:40, 15 November 2021 diff hist +5 Insulators, Receptacle connectors and cables: drawings and inventories →EPOXY RECEPTACLES
- 15:39, 15 November 2021 diff hist 0 N File:HV cables Inventory updated Nov 15 2021.png current
- 15:39, 15 November 2021 diff hist +32 Insulators, Receptacle connectors and cables: drawings and inventories →HIGH VOLTAGE CABLES
- 15:38, 15 November 2021 diff hist -42 Insulators, Receptacle connectors and cables: drawings and inventories →HIGH VOLTAGE CABLES
- 11:16, 5 November 2021 diff hist 0 N File:SF6 K-bottle we buy is 250 cf capacity at 2000 PSIG.png current
- 11:16, 5 November 2021 diff hist +283 SF6 inventory and handling procedures including DILO carts operating manuals current
- 11:10, 5 November 2021 diff hist 0 N File:SF6 inventory table updated Nov 5 2021.png current
- 11:09, 5 November 2021 diff hist +1 SF6 inventory and handling procedures including DILO carts operating manuals
- 11:09, 5 November 2021 diff hist 0 N File:SF6 inventory updated Nov 5 2021.xlsx current
- 11:09, 5 November 2021 diff hist 0 N File:SF6 volumes and weights for all HVPS tanks and Pig.xlsx current
- 11:08, 5 November 2021 diff hist +93 SF6 inventory and handling procedures including DILO carts operating manuals
- 14:58, 13 October 2021 diff hist 0 N File:LERF-FEL SF6 transfer system procedure documented September 2021.pptx current
- 14:57, 13 October 2021 diff hist 0 N File:GTS SF6 transfer operational procedure.pptx current
- 14:57, 13 October 2021 diff hist +136 SF6 inventory and handling procedures including DILO carts operating manuals
- 14:26, 6 October 2021 diff hist 0 N File:This is the option John bought the Glassman HVPS with.pdf current
- 14:26, 6 October 2021 diff hist 0 Glassman High Voltage Power Supplies
- 14:25, 6 October 2021 diff hist 0 N File:Glassman OS Series manual.pdf current
- 14:24, 6 October 2021 diff hist +2 Glassman High Voltage Power Supplies
- 14:24, 6 October 2021 diff hist +109 Glassman High Voltage Power Supplies
- 13:35, 6 October 2021 diff hist -4 Electrical Area current
- 13:35, 6 October 2021 diff hist +5 Electrical Area
- 13:34, 6 October 2021 diff hist 0 N File:Keithley 6487 ammeter + 500 VDC source manual.pdf current
- 13:33, 6 October 2021 diff hist +175 Electrical Area →Custom Instrumentation & Controls
- 15:24, 4 October 2021 diff hist 0 N File:Wien blue 10-1-2021.jpg current
- 15:23, 4 October 2021 diff hist +32 Magnet current
- 15:22, 4 October 2021 diff hist -3 Magnet
- 15:22, 4 October 2021 diff hist +288 Magnet
- 15:17, 4 October 2021 diff hist 0 N File:U-Wien Xometry electrodes metrology polished vs unpolished.pptx current
- 15:16, 4 October 2021 diff hist +75 Electrode plates current
- 08:58, 29 September 2021 diff hist 0 N File:Carlos' report 09-29-21.pdf current
- 08:58, 29 September 2021 diff hist +39 Sep 29, 2021 - Group Meeting current
- 08:55, 29 September 2021 diff hist -39 Sep 29, 2021 - Group Meeting
- 08:50, 29 September 2021 diff hist +40 Sep 29, 2021 - Group Meeting
- 08:27, 29 September 2021 diff hist +227 Sep 29, 2021 - Group Meeting
- 07:58, 23 September 2021 diff hist +62 CIS OnCall and Troubleshooting →OnCall Responsibilities
- 07:56, 23 September 2021 diff hist +15 CIS OnCall and Troubleshooting →OnCall Responsibilities
- 07:56, 23 September 2021 diff hist +34 CIS OnCall and Troubleshooting →OnCall Responsibilities
- 07:30, 21 September 2021 diff hist +87 CIS Conference and Workshop Proceedings →2021
- 07:58, 14 September 2021 diff hist 0 N File:GTS-SF6 Automatic Gas Transfer System by Kevin Jordan 2007 uopdated by Carlos 2021.pptx current
- 07:58, 14 September 2021 diff hist +28 CIS Safety →LERF Specific
- 07:57, 14 September 2021 diff hist 0 N File:LERF-FEL SF6 transfer system overview documented September 2021.pptx current
- 07:56, 14 September 2021 diff hist +130 CIS Safety →LERF Specific
- 09:20, 8 September 2021 diff hist +17 Electrode
- 09:20, 8 September 2021 diff hist +116 Electrode
- 09:18, 8 September 2021 diff hist +115 Sep 08, 2021 - Group Meeting
- 09:14, 8 September 2021 diff hist 0 N File:Electrode assembly on white R30 back end view zoom.jpg current
- 09:14, 8 September 2021 diff hist +157 Electrode
- 09:10, 8 September 2021 diff hist +64 Sep 08, 2021 - Group Meeting
- 09:08, 8 September 2021 diff hist 0 N File:CEBAF-UITF electrodes history updated Sept 2021.pptx current
- 09:08, 8 September 2021 diff hist +18 Sep 08, 2021 - Group Meeting
- 09:07, 8 September 2021 diff hist +47 Sep 08, 2021 - Group Meeting
- 15:06, 27 August 2021 diff hist +89 CIS Conference and Workshop Proceedings
- 15:05, 27 August 2021 diff hist 0 N File:Hernandez-Garcia IEEE ceidp 2021 REVISED final.pdf current
- 15:04, 27 August 2021 diff hist +62 CIS Conference and Workshop Proceedings
- 07:48, 5 August 2021 diff hist +85 Magnet
- 07:46, 5 August 2021 diff hist +713 N Magnet Created page with "* The steel magnet yoke and its coil are stored in the Wien cabinet in the test lab. Both coil and and steel yoke are copies of the CEBAF upgrade Wiens, to operate at 15 A for..."
- 07:37, 5 August 2021 diff hist +407 N Electrode plates Created page with "* One pair of electrodes made from a single piece of SS in a CNC machine (by Xometry, not very good quality, next time use the JLab machine shop) are being polished by Bubba..."
- 07:35, 5 August 2021 diff hist +79 Tasks U-Wien current
- 07:34, 5 August 2021 diff hist +397 N Tasks U-Wien Created page with "* <span style="font-size:100%"> '''Magnet''' </span> * <span style="font-size:100%"> '''Electrode plates''' </span> * <span style="font-size:100%"> '''Assembly''..."
- 16:46, 4 August 2021 diff hist +138 Background current
- 16:38, 4 August 2021 diff hist 0 Tasks
- 16:36, 4 August 2021 diff hist -1 Tasks
- 16:35, 4 August 2021 diff hist -73 Tasks
- 16:34, 4 August 2021 diff hist +20 UITF Wien current
- 16:32, 4 August 2021 diff hist -1 Tasks
- 16:32, 4 August 2021 diff hist +80 Tasks
- 16:31, 4 August 2021 diff hist -7 Tasks
- 16:31, 4 August 2021 diff hist -92 Tasks
- 16:19, 4 August 2021 diff hist +84 Background
- 16:18, 4 August 2021 diff hist +2,232 N Background Created page with "The Wien filter (AKA U-WIen) is based on the CEBAF Wien design. It was first built using brazed electrodes, spare from CEBAF V-Wien, and 20 kV SHV-style feedthroughs. New magn..."
- 16:00, 4 August 2021 diff hist +62 UITF Wien
- 15:57, 4 August 2021 diff hist +211 N UITF Wien Created page with "* <span style="font-size:100%"> '''Tasks''' </span> * <span style="font-size:100%"> '''Drawings''' </span> * <span style="font-size:100%"> '''Electrostatic and be..."
- 15:54, 4 August 2021 diff hist +61 Research and Design
- 14:27, 4 August 2021 diff hist -1 HV insulator for 500 kV current
- 14:26, 4 August 2021 diff hist 0 N File:Proposal Lab 20-2310 narrative submitted Hernandez-Garcia & Poelker.pdf current
- 14:26, 4 August 2021 diff hist +852 HV insulator for 500 kV
- 11:06, 30 July 2021 diff hist 0 N File:Cebaf wien hv 20210715.pdf current
- 11:06, 30 July 2021 diff hist +111 CIS OnCall and Troubleshooting
- 14:50, 19 July 2021 diff hist +234 CIS OnCall and Troubleshooting →Bypassing the gun 15 deg dipole magnet
- 14:49, 19 July 2021 diff hist +301 CIS OnCall and Troubleshooting →Bypassing the gun 15 deg dipole magnet
- 14:46, 19 July 2021 diff hist +46 CIS OnCall and Troubleshooting
- 12:14, 13 July 2021 diff hist 0 N File:SF6 volumes and weights for all of the Glassman HVPS tanks.xlsx current
- 12:13, 13 July 2021 diff hist +75 SF6 inventory and handling procedures including DILO carts operating manuals
- 10:20, 8 July 2021 diff hist 0 N File:ACC2003000-0607, ELECTRODE BACK END with holes for tightening screws.pdf current
- 10:20, 8 July 2021 diff hist +85 Drawings
- 10:14, 8 July 2021 diff hist -9 Drawings
- 10:14, 8 July 2021 diff hist +39 Drawings
- 10:13, 8 July 2021 diff hist -9 Drawings
- 10:13, 8 July 2021 diff hist +39 Drawings
- 10:12, 8 July 2021 diff hist -18 Drawings
- 10:11, 8 July 2021 diff hist +38 Drawings
- 10:10, 8 July 2021 diff hist 0 N File:Spherical electrode internal mount.pdf current
- 10:09, 8 July 2021 diff hist +50 Drawings
- 10:09, 8 July 2021 diff hist +137 N Drawings Created page with "* Media:Vacuum Chamber Dimensions.pdf [https://wiki.jlab.org/ciswiki/index.php/18%22_Photogun_ala_GTS Back to 18" Photogun page]"