Difference between revisions of "Run Group B"

From clas12-run
Jump to navigation Jump to search
(Undo revision 2799 by Hattawy (talk))
Line 102: Line 102:
 
* Tuesday
 
* Tuesday
 
** Day - 9am machine off for component change to fix Hall-B beam instabilities (see multiple entries in the Ops ELOG for details).
 
** Day - 9am machine off for component change to fix Hall-B beam instabilities (see multiple entries in the Ops ELOG for details).
** Swing and Owl production data taking at 50nA. Timings dependant on the above MCC plan.
+
** Swing and Owl production data taking at 50nA if possible. Timings dependant on the above MCC plan.
 +
 
 +
* Wednesday
 +
** Owl - Production data at 50nA
 +
** Day - Production data at 50nA
 +
** Swing - Production data at 50nA
 +
 
 +
*Thursday
 +
** Owl - At 2am begin Empty Target run at 150nA. Let run until beam off at 7am
 +
** 7am Target Warm-Up (for NTT)
  
* Before the 30th Jan:
 
** Moller run (my current thinking is we will not do this should the Hall-C spin dance be pushed until after end of run)
 
** Empty target in standard configuration
 
** Low Luminosity 10 nA, remaining 30M events
 
  
 
* Please note that we have added two items to the list of tasks for each run.  
 
* Please note that we have added two items to the list of tasks for each run.  

Revision as of 15:35, 28 January 2020

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

Manuals

Procedures

JLab Logbooks

RC schedule

  • Nov 20 - Nov 27: S. Stepanyan
  • Nov 27 - Dec 4: M. Contalbrigo
  • Dec 4 - Dec 11: D. Sokhan
  • Dec 11 - Dec 18: S. Niccolai
  • Dec 18 - Dec 20 S. Stepanyan
  • Jan 7 - Jan 15: J. Gilfoyle
  • Jan 15 - Jan 22: F. Hauenstein /W. Phelps
  • Jan 22 - Jan 30: B. McKinnon


Clas12design.png