* When we get done with DC roads study ad the beam is stable, using the highest luminosity, take 50M events in a single run for ctof and ftof calibration and notify David (dpaye001@odu.edu and hattawy@jlab.org) to cook the run and notify Daniel Carmen (carmen@jlab.org) when the cooking is finished. | * When we get done with DC roads study ad the beam is stable, using the highest luminosity, take 50M events in a single run for ctof and ftof calibration and notify David (dpaye001@odu.edu and hattawy@jlab.org) to cook the run and notify Daniel Carmen (carmen@jlab.org) when the cooking is finished. | ||
− | + | <font color=green> | |
− | |||
====<font color=blue>''A. Establishing the beam (Updated at 18:03)''</font>==== | ====<font color=blue>''A. Establishing the beam (Updated at 18:03)''</font>==== | ||
# Keep not changed: | # Keep not changed: | ||
Line 127: | Line 126: | ||
# if what you get is similar to the references, call the mcc and tell them the the beam is acceptable and take beam away. | # if what you get is similar to the references, call the mcc and tell them the the beam is acceptable and take beam away. | ||
+ | </font> | ||
− | ====<font color=blue>''B. Electron-inbending Configuration, D2 target @ 10.4 GeV beam''</font>==== | + | ====<font color=blue>''B. Electron-inbending Configuration, D2 target @ 10.4 GeV beam (100M events in total)''</font>==== |
<b>DAQ config:PROD66_PIN; Trigger file:rgf_inbending_v2_1.trg </b> | <b>DAQ config:PROD66_PIN; Trigger file:rgf_inbending_v2_1.trg </b> | ||
Revision as of 21:55, 18 February 2020
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
RC schedule Weekly form
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group F, Spring 2020
Beam energy 10.38 GeV (5 pass)
Important: Document all your work in the logbook!
RC: Mohammad Hattawy (Full list of RG-F RCs)
- 757-575-7540
- 9 757-575-7540 from Counting Room
PDL: Stepan Stepanyan
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan, 2020(Last updated: Feb 18th, 2020 @ 9:00 AM) Requests
A. Establishing the beam (Updated at 18:03)
B. Electron-inbending Configuration, D2 target @ 10.4 GeV beam (100M events in total)DAQ config:PROD66_PIN; Trigger file:rgf_inbending_v2_1.trg
At the end of each run, follow the standard DAQ restart sequence
References and Standards:(last update Feb 18, 2020 @ 19:00 PM.) Restoration of Beam to Hall B
Nominal Beam Positions
FSD Thresholds
FSD Dwell time
BONuS HV setting Reference Harp Scans for Beam on Tagger Dump: 2C21 [2], 2C24 [3] Reference Harp Scans for Beam on Faraday Cup: 2H01 [4] Reference Monitoring Histograms 5 nA production trigger [5] Reference Scalers and Halo-Counter Rates: |
General Instructions:
Once Per Day (At 13:00):
Every Shift:
|
- Note 1: FTOF HVs: The goal is to minimize the number of power cycles of the dividers.
- should be turned off during the initial beam tuning down to the Faraday Cup after CLAS12 has been off for a long shutdown, when doing a Moller run, when doing harp scans, or if there is tuned/pulsed beam in the upstream beamline.
- should be left on after an initial beam tune has been established and if there are only minor steering adjustments and “tweaks” being made.
- if shift workers have doubts what to do with the HVs, they can always contact the TOF on-call expert for advice.
- Note 2: In case of a Torus and/or Solenoid Fast Dump do the following:
- Notify MCC to request beam OFF and to drop Hall B status to Power Permit
- Call Engineering on-call
- Make separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" field add Ruben Fair, Probir Goshal, Dave Kashy and esr-users@jlab.org
- Notify Run Coordinator
- Turn off all detectors
- Note 3: When beam is being delivered to the Faraday Cup:
- the Fast Shut Down elements: Upstream, Midstream, Downstream, BOM, and Solenoid should always be in the state UNMASKED
- No changes to the FSD threshold should be made without RC or beamline expert approval
- Note 4: Any request for a special run or change of configuration has to be approved by the RC & documented
- Note 5: Carefully check the BTA every hour and run the script btaGet.py to print for you what HAS TO BE in BTA for this hour. Edit BTA if it is incorrect.
- Note 6: Reset CLAS12MON frequently to avoid histogram saturation. If CLAS12MON is restarted change MAX scale to 10 (default is 5) for DC normalized occupncy histograms. This would prevent them from saturation. See log entry [11]
- Note 7: Shift workers must check the occupancies! Use this tool to compare to previous runs: [12]
- Note 8: Check the vacuum periodically, make sure vacuum is not higher than 5e-5
- Note 9: Always reset the CFD threshold after all power off/on on the CND CAMAC crate
After the CAMAC crate (camac1) holding the CND CFD boards is switched off for any reason, it is mandatory to reset the associated thresholds typing the following command from any clon machine terminal: $CODA/src/rol/Linux_x86_64/bin/cnd_cfd_thresh -w 0
If this command is failing and the crate is not responding, reboot it as follows: roc_reboot camac1
- Note 10: Shift workers should anyway check routinely scalers to verify they update correctly and make a logbook entry if anomalies are observed after starting a new run.
- Note 11:
For RICH recovery procedures, please see Log entry https://logbooks.jlab.org/entry/3562273. This would apply in the cases of 1. DAQ crash: rich4 is not responding or 2. RICH alarms (LV,missing tile, temperature etc). If it does not work or you are uncertain about what to do, contact the RICH expert on call. Please, note that missing tiles typically occur due to lost communication. Keep in mind that the recovery procedure will kill DAQ. If DAQ is running for other purpose, rather than data taking (for which the RICH acceptance would be important) do not initiate the recovery procedure.
- The most critical parameter for RICH is the temperature of the photosensors. If the temperature rises above limits, an interlock will automatically turn the RICH HV and LV. If this happens, notify the expert on call and keep taking data without RICH.
- Note 12: Asymmetry on FTCal ADC Scalers: If the beam current is 5 - 10 nA, and the observed asymmetry is out of specs, i.e. > +-2.5%, check (1) that the beam position is according to specs, (2) the response of the rest of CLAS (compare the scalers of FTOF, CTOF, ECAL, etc. from the Scalers GUI to the reference for that current, as posted above). If positions and other detectors do not show any anomalies, keep running. The ADC scalers require at least ~15 nA for a reliable response.
- Note 13: If ROC mmft1 is 100% busy: power cycle FTT LV (FT->FTT Overview, HV stays ON), roc_reboot mmft1, wait until it reboots (ssh mmft1 to verify). If the first LV recycle/mmft1 reboot doesn’t work call FT expert