Difference between revisions of "NPS Assembly"
Jump to navigation
Jump to search
Line 16: | Line 16: | ||
* Crystal Wrapping Procedure [https://wiki.jlab.org/cuawiki/index.php/Wrapping_procedure Link] | * Crystal Wrapping Procedure [https://wiki.jlab.org/cuawiki/index.php/Wrapping_procedure Link] | ||
+ | ::* To be completed in May 2022 | ||
+ | ::* On site personnel: AANL (2), CUA (2-3), DSG (1-2, at the end of May) | ||
=== Assembly === | === Assembly === |
Revision as of 16:15, 18 April 2022
Task List 2022
- Link to the Google Doc
Resource List
Pre-assembly
- Reflector pre-shaping procedure and material
- Crystal Wrapping Procedure Link
- To be completed in May 2022
- On site personnel: AANL (2), CUA (2-3), DSG (1-2, at the end of May)
Assembly
Mechanical
- NPS Deck Pictures (April 2022)
- NPS Deck Pictures (March 2022)
Magnet
Crystals
- Overview of crystal properties
- spreadsheet from CRYTUR (January 2022) (dimensions, transmittance, light yield, radiation hardness)
DAQ/Electronics/Analyzer
- Link to DAQ/Electronics/Analyzer Meetings Meetings. Contact David Hamilton for details.
- GitHub link (contact Brad, Carlos Y., or Steve W. for access)