Difference between revisions of "NPS Assembly"
Jump to navigation
Jump to search
Line 26: | Line 26: | ||
* [http://www.jlab.org/~munoz/NPS_mounting_procedure.pptx Assembly Procedure Steps] | * [http://www.jlab.org/~munoz/NPS_mounting_procedure.pptx Assembly Procedure Steps] | ||
− | ::* planned for June 2022 | + | ::* planned for June 2022 |
− | ::* onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3 | + | ::* onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2) |
+ | ::* [https://wiki.jlab.org/cuawiki/images/6/67/Time_mounting_graph.xlsx Assembly time estimate] | ||
− | * [https://wiki.jlab.org/cuawiki/images/ | + | * Assembly Status 6/10/2022 |
+ | ::* Stacking complete [https://wiki.jlab.org/cuawiki/images/7/7b/Nps0.jpeg NPS picture] | ||
+ | ::* Three columns cabled and available for detector checkout | ||
* [https://wiki.jlab.org/cuawiki/index.php/NPS_DAQ/Electronics_and_Analyzer_Meeting_(online,_2/25_2022) Detector checkout plans and task lists] | * [https://wiki.jlab.org/cuawiki/index.php/NPS_DAQ/Electronics_and_Analyzer_Meeting_(online,_2/25_2022) Detector checkout plans and task lists] | ||
::* planned for July/August | ::* planned for July/August | ||
− | ::* onsite personnel: OU (1-2), ODU (1), AANL (2), CUA (2-3), U. Glasgow ( | + | ::* onsite personnel: OU (1-2), ODU (1), AANL (2), CUA (2-3), U. Glasgow (3) |
* [https://wiki.jlab.org/cuawiki/images/b/b7/NPS-module-assembly-tracking-sheet_v2.xlsx NPS module assembly tracking spreadsheet] | * [https://wiki.jlab.org/cuawiki/images/b/b7/NPS-module-assembly-tracking-sheet_v2.xlsx NPS module assembly tracking spreadsheet] |
Revision as of 08:17, 24 June 2022
Task List 2022
- Link to the Google Doc
Resource List
Pre-assembly - COMPLETE (5/27/2022)
- Reflector pre-shaping procedure and material
- Crystal Wrapping Procedure Link
- To be completed in May 2022
- On site personnel: AANL (2), CUA (3), MSU (1), UIC (1), DSG (1-2, at the end of May)
- Crystal Wrapping Documentation
Assembly
- planned for June 2022
- onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2)
- Assembly time estimate
- Assembly Status 6/10/2022
- Stacking complete NPS picture
- Three columns cabled and available for detector checkout
- planned for July/August
- onsite personnel: OU (1-2), ODU (1), AANL (2), CUA (2-3), U. Glasgow (3)
Mechanical
- NPS Deck Pictures (April 2022)
- NPS Deck Pictures (March 2022)
Magnet
Crystals
- Overview of crystal properties
- spreadsheet from CRYTUR (January 2022) (dimensions, transmittance, light yield, radiation hardness)
DAQ/Electronics/Analyzer
- Link to DAQ/Electronics/Analyzer Meetings Meetings. Contact David Hamilton for details.
- GitHub link (contact Brad, Carlos Y., or Steve W. for access)