Difference between revisions of "NPS Assembly"

From Cuawiki
Jump to navigation Jump to search
Line 17: Line 17:
 
* Crystal Wrapping Procedure [https://wiki.jlab.org/cuawiki/index.php/Wrapping_procedure Link]
 
* Crystal Wrapping Procedure [https://wiki.jlab.org/cuawiki/index.php/Wrapping_procedure Link]
 
::* To be completed in May 2022
 
::* To be completed in May 2022
::* On site personnel: AANL (2), CUA (2-3), DSG (1-2, at the end of May)
+
::* On site personnel: AANL (2), CUA (2-3), MSU (1), UIC (1, TBC), DSG (1-2, at the end of May)
  
 
=== Assembly ===
 
=== Assembly ===

Revision as of 17:17, 19 April 2022

Task List 2022

  • Link to the Google Doc

Resource List

Pre-assembly

  • Reflector pre-shaping procedure and material
  • Crystal Wrapping Procedure Link
  • To be completed in May 2022
  • On site personnel: AANL (2), CUA (2-3), MSU (1), UIC (1, TBC), DSG (1-2, at the end of May)

Assembly

  • planned for June 2022
  • onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), ODU (1), OU (1-2), U. Glasgow (TBD)
  • planned for July/August
  • onsite personnel: OU (1-2), ODU (1), AANL (2), CUA (2-3), U. Glasgow (TBD)

Mechanical

  • NPS Deck Pictures (April 2022)
  • NPS Deck Pictures (March 2022)

Magnet

Crystals

  • Overview of crystal properties

DAQ/Electronics/Analyzer

  • GitHub link (contact Brad, Carlos Y., or Steve W. for access)