Difference between revisions of "February 28th, 2023"

From kl project
Jump to navigation Jump to search
 
(16 intermediate revisions by the same user not shown)
Line 1: Line 1:
<b>Attended</b>: ... and ''Igor''.
+
<b>Attended</b>: ''Moskov'', ''Mikhail'', ''Justin'', ''Sean'', ''Hovanes'', and ''Igor''. Today, ''Jim'' is in a finding commission.
  
 
* ''Moskov'' proposed to think about ERR-I in March/April [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR].
 
* ''Moskov'' proposed to think about ERR-I in March/April [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR].
Line 6: Line 6:
  
  
* On February 27th, we had a meeting with FNAL folks to discuss a possibility to use FNAL dipole for the CPS.
+
* On February 27th, we had a meeting with FNAL folks to discuss a possibility to use FNAL EPB dipole for the CPS.
 +
* Questions from ''Dave Harding'':
 +
:* What is your schedule?  When would you need the magnet?
 +
:* Should we assume that this is a permanent installation rather than a loan?
 +
:* Would the magnet go straight to JLab?  The issue here is making sure that whatever organization receives the magnet has the appropriate licenses to handle the (very slightly) radioactive material.
 +
:* Given the current condition of the magnets that we do not consider ready spares, would you want us to refurbish the selected magnet to our current standards?
 +
:* Do you have any special requirements on the power and water connections?  [https://wiki.jlab.org/klproject/images/a/a7/20220302_121838.jpg I’m attaching a photo of one such magnet that we refurbished last year so you can get a feeling for our standard configuration].
 +
:* Would you want our beam tube left in place?
 +
:* Would you need a spare magnet?
 +
* [https://wiki.jlab.org/klproject/images/b/be/FNALMEETING022723.pdf ''Vitaly's'' slides]
 +
 
 +
 
 +
* On February 27th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_February_27,_2023].
 +
:* [[media:cps_absorber_temp_tim_02_27_23.pdf | Temperature calculations]] (''Tim'').
 +
:* [[media:CPSKPTPRESENT022723.pdf | Radiation and Current Leakage between winding  in  Coil Return Area]] ''Vitaly's'' model.
 +
 
  
 
* On February 20th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_February_20,_2023].
 
* On February 20th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_February_20,_2023].
 
:* Temperature calculations (''Tim'').
 
:* Temperature calculations (''Tim'').
 
:* Review of ''Vitaly's'' model.
 
:* Review of ''Vitaly's'' model.
 +
  
 
* On February 6th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_February_6,_2023].
 
* On February 6th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_February_6,_2023].
 
:* [https://wiki.jlab.org/klproject/images/7/77/Temp_calc_cps_02_06_2023.pdf Temperature calculations] (''Tim'').
 
:* [https://wiki.jlab.org/klproject/images/7/77/Temp_calc_cps_02_06_2023.pdf Temperature calculations] (''Tim'').
 
:* Review of ''Vitaly's'' model.
 
:* Review of ''Vitaly's'' model.
 +
  
 
* On February 9th, we had a ''Hovanes'' KPT meeting for to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR].
 
* On February 9th, we had a ''Hovanes'' KPT meeting for to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR].

Latest revision as of 10:22, 28 February 2023

Attended: Moskov, Mikhail, Justin, Sean, Hovanes, and Igor. Today, Jim is in a finding commission.

  • Moskov proposed to think about ERR-I in March/April [1].
  • Moskov proposed to think about a 7th KLF Collaboration Meeting in May/June after ERR-!.


  • On February 27th, we had a meeting with FNAL folks to discuss a possibility to use FNAL EPB dipole for the CPS.
  • Questions from Dave Harding:
  • What is your schedule? When would you need the magnet?
  • Should we assume that this is a permanent installation rather than a loan?
  • Would the magnet go straight to JLab? The issue here is making sure that whatever organization receives the magnet has the appropriate licenses to handle the (very slightly) radioactive material.
  • Given the current condition of the magnets that we do not consider ready spares, would you want us to refurbish the selected magnet to our current standards?
  • Do you have any special requirements on the power and water connections? I’m attaching a photo of one such magnet that we refurbished last year so you can get a feeling for our standard configuration.
  • Would you want our beam tube left in place?
  • Would you need a spare magnet?


  • On February 27th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].


  • On February 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [3].
  • Temperature calculations (Tim).
  • Review of Vitaly's model.


  • On February 6th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [4].


  • On February 9th, we had a Hovanes KPT meeting for to prepare for ERR-I [5].