Difference between revisions of "KLF Beamline"
Jump to navigation
Jump to search
(16 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
=== Meetings in 2025 === | === Meetings in 2025 === | ||
+ | * [[KLF beamline meeting - March 20, 2025]] | ||
+ | * [[KLF beamline meeting - March 13, 2025]] | ||
+ | * [[KLF beamline meeting - March 6, 2025]] | ||
+ | * [[KLF beamline meeting - February 27, 2025]] | ||
+ | * [[KLF beamline meeting - February 13, 2025]] | ||
+ | * [[KLF beamline meeting - February 6, 2025]] | ||
* [[KLF beamline meeting - January 30, 2025]] | * [[KLF beamline meeting - January 30, 2025]] | ||
* [[KLF beamline meeting - January 23, 2025]] | * [[KLF beamline meeting - January 23, 2025]] | ||
Line 54: | Line 60: | ||
[[media:KPT_Collimator_cave_layout.pdf | Collimator Cave engineering drawing showing the overview of the beamline and the KPT design]] | [[media:KPT_Collimator_cave_layout.pdf | Collimator Cave engineering drawing showing the overview of the beamline and the KPT design]] | ||
− | = Basic Parameters = | + | = Basic Parameters for KLF beamline= |
{| border=1 | {| border=1 | ||
|+ Table: KLF beamline basic parameters inside and after collimator cave (green background means the parameter is defined). | |+ Table: KLF beamline basic parameters inside and after collimator cave (green background means the parameter is defined). | ||
|- bgcolor=#DFDFDF | |- bgcolor=#DFDFDF | ||
− | ! width= | + | ! width=350px | Paramater !! width=200px | Value !! width=300px | Comment |
|-style="background-color:lime" | |-style="background-color:lime" | ||
− | | Radiator thickness | + | | Radiator thickness (z) || align=center | 0.2 X<sub>0</sub> || align=left | Made of copper (2.87mm) |
|-style="background-color:lime" | |-style="background-color:lime" | ||
− | | Be target length | + | | Be target length (z) || align=center | 40cm || align=left | |
|-style="background-color:lime" | |-style="background-color:lime" | ||
− | | Be target diameter | + | | KPT upstream γ-beam channel width (x&y) || align=center | 14cm || align=left | Rectangular (square cross section) |
+ | |-style="background-color:lime" | ||
+ | | Be target diameter || align=center | 7cm || align=left | Cylindrical (circular cross section) | ||
+ | |-style="background-color:lime" | ||
+ | | Tungsten plug length (z) || align=center | 14cm || align=left | 90/10 W/Cu, ρ=16.5 g/cm<sup>3</sub> | ||
+ | |-style="background-color:lime" | ||
+ | | Tungsten plug width (x&y) || align=center | 14.2cm || align=left | Rectangular (square cross section) | ||
|-style="background-color:lime" | |-style="background-color:lime" | ||
− | | | + | | KPT downstream K<sub>L</sub>-beam channel width (x&y)|| align=center | 6.7cm || align=left | Rectangular (square cross section) |
− | |||
− | |||
|- | |- | ||
− | | Beam pipe diameters | + | | Beam pipe diameters || align=center | ??cm || align=left | Needs optimizing |
|- | |- | ||
− | | Beamline shielding wall | + | | Beamline shielding wall || align=center | ?? || align=left | Needs optimizing |
|- style="background-color:lime" | |- style="background-color:lime" | ||
− | | Sweeping magnetic field | + | | Sweeping magnetic field || align=center | 0.82 (T•m) || align=left | |B<sub>x</sub>|=0.23T inside the gap |
|- style="background-color:lime" | |- style="background-color:lime" | ||
− | | PS magnetic field | + | | PS magnetic field || align=center | 1.65 (T•m) || align=left | |B<sub>x</sub>|=1.8T inside the gap |
|- style="background-color:lime" | |- style="background-color:lime" | ||
− | | LH2 target length | + | | LH2 target length (z) || align=center | ~40cm || align=left | May not be final |
|- style="background-color:lime" | |- style="background-color:lime" | ||
− | | LH2 target diameter | + | | LH2 target diameter || align=center | 6cm || align=left | |
|} | |} | ||
Latest revision as of 08:32, 17 March 2025
Beamline Meetings
Weekly remote Zoom meetings on Thursdays at 9:00am
Meetings in 2025
- KLF beamline meeting - March 20, 2025
- KLF beamline meeting - March 13, 2025
- KLF beamline meeting - March 6, 2025
- KLF beamline meeting - February 27, 2025
- KLF beamline meeting - February 13, 2025
- KLF beamline meeting - February 6, 2025
- KLF beamline meeting - January 30, 2025
- KLF beamline meeting - January 23, 2025
- KLF beamline meeting - January 16, 2025
Meetings in 2024
- KLF beamline meeting - December 19, 2024
- KLF beamline meeting - December 12, 2024
- KLF beamline meeting - December 5, 2024
- KLF beamline meeting - November 21, 2024
- KLF beamline meeting - November 14, 2024
- KLF beamline meeting - November 7, 2024
- KLF beamline meeting - October 31, 2024
- KLF beamline meeting - October 24, 2024
- KLF beamline meeting - October 17, 2024
- KLF beamline meeting - October 10, 2024
- KLF beamline meeting - October 3, 2024
- KLF beamline meeting - September 26, 2024
- KLF beamline meeting - September 19, 2024
- KLF beamline meeting - September 6, 2024
- KLF beamline meeting - August 23, 2024
- KLF beamline meeting - August 9, 2024
- KLF beamline meeting - July 26, 2024
- KLF beamline meeting - July 12, 2024
- KLF beamline meeting - June 28, 2024
- KLF beamline meeting - June 14, 2024
- KLF beamline meeting - May 29, 2024
- KLF beamline meeting - May 1, 2024
- KLF beamline meeting - April 17, 2024
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1606674688?pwd=b3dnTzJWVEtxZExGRnFoY29PSGkxQT09 Meeting ID: 160 667 4688 Passcode: 709878
Pages for the KLF new beamline components
Drawings
Collimator Cave engineering drawing showing the overview of the beamline and the KPT design
Basic Parameters for KLF beamline
Paramater | Value | Comment |
---|---|---|
Radiator thickness (z) | 0.2 X0 | Made of copper (2.87mm) |
Be target length (z) | 40cm | |
KPT upstream γ-beam channel width (x&y) | 14cm | Rectangular (square cross section) |
Be target diameter | 7cm | Cylindrical (circular cross section) |
Tungsten plug length (z) | 14cm | 90/10 W/Cu, ρ=16.5 g/cm3 |
Tungsten plug width (x&y) | 14.2cm | Rectangular (square cross section) |
KPT downstream KL-beam channel width (x&y) | 6.7cm | Rectangular (square cross section) |
Beam pipe diameters | ??cm | Needs optimizing |
Beamline shielding wall | ?? | Needs optimizing |
Sweeping magnetic field | 0.82 (T•m) | |Bx|=0.23T inside the gap |
PS magnetic field | 1.65 (T•m) | |Bx|=1.8T inside the gap |
LH2 target length (z) | ~40cm | May not be final |
LH2 target diameter | 6cm |
Requirements for KLF electron beam tuning
Beam Paramater | @ CPS radiator | @ KPT entrance |
---|---|---|
Beam current | 50 nA ≤ IB ≤ 5 μA | N/A |
Beam emmitances | εx,y ≤ 20 nm-rad | Ν/Α |
Beam spot size | σx,y = 1.2 mm, (0.8 mm ≤ σx,y ≤ 1.5 mm) | σx,y ≤ 1 cm |
Beam position stability (@ 1 Hz) | σx,y ≤ 0.2 mm | σx,y ≤ 2 mm |
Beam halo (halo-to-peak) | < 10−4 at r ≥ 5σx,y | N/A |
Beam excursion limits in FSD | Δx,y ≥ 1 mm | Δx,y ≥ 1 cm |
Bleedthrough from out-of-time bunches | Specs undefined | N/A |