File:LHRS maps mar17.pdf
Jump to navigation
Jump to search
LHRS_maps_mar17.pdf (file size: 97 KB, MIME type: application/pdf)
Overview over cable connections in the right electronic rack on the LHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tritium run in fall17/spring18. Plots done by Mike Nycz
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Dimensions | User | Comment | |
---|---|---|---|---|
current | 13:51, 2 December 2017 | (97 KB) | Hauenst (talk | contribs) | Reverted to version as of 21:00, 1 July 2017, Updated file was wrong |
13:46, 2 December 2017 | (125 KB) | Hauenst (talk | contribs) | Updates for some PRL channels. Current Version from end of November. | |
16:00, 1 July 2017 | (97 KB) | Hauenst (talk | contribs) | Overview over cable connections in the right electronic rack on the LHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tr... |
You cannot overwrite this file.
File usage
There are no pages that use this file.