Difference between revisions of "Installation and Configuration"
Jump to navigation
Jump to search
m (→Target Info) |
m |
||
Line 1: | Line 1: | ||
− | [https://wiki.jlab.org/tegwiki/index.php/ | + | [https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] |
==Target Info == | ==Target Info == |
Latest revision as of 17:51, 13 January 2018
Back to Installation and Commissioning
Target Info
- Survey, Density, Windows and other Info of the Target link
- Hall A target gas cell fill pressures and temperatures halog
- He3 Certification file
- Hall-A Tritium Target FSD Verification Checklist file
Survey Info
Beam Instrumentation
Spectrometer Angles
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
17 | 12/04/2017 | SRC | xxxx ~ xxxx | link |
- HRS-R
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
17 | 12/04/2017 | SRC | xxxx ~ xxxx | link |