Difference between revisions of "Hyp-StraMeeting 20220203"
Jump to navigation
Jump to search
(11 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
* Beam time | * Beam time | ||
− | ** When ? <br> → 2026~? | + | ** When ? <br> → Could be in 2026~ even in Hall C. |
− | ** Can be longer ? | + | ** Moller 2024. SBS is being tried to be done before that. <br> → HKS would be in 2029~ in the case of Hall A. |
+ | ** Could HRS-HRS (hyper) be jumped in (in 2024? for example)?<br> → HRS-HKS could take a similar time to install. | ||
+ | ** Can be longer ? <br><br> | ||
+ | |||
+ | → 1. HRS-HKS in Hall A (2024?), 2. XXX-HKS in Hall C (2026~), 3. quick HRS-HRS(HKS) experiment (+ α later) in Hall A | ||
+ | |||
* PAC | * PAC | ||
Line 19: | Line 24: | ||
==Report== | ==Report== | ||
* Information to share | * Information to share | ||
− | ** PCS status | + | ** PCS status (Nue, Sho) |
− | ** Hall A / C simulation ( | + | *** Feb 6 (Newport News) |
− | + | *** will be unloaded in ESB | |
+ | ** Hall A / C simulation (Sho, Nue) | ||
==Discussion (2)== | ==Discussion (2)== | ||
− | * | + | * Draft prepared (nnΛ) |
+ | ** Significance calculation → Bishnu will send us how he obtained the result. | ||
+ | ** Nue will ask Harada san for his opinions. | ||
* Presentations in Hall A Winter Collaboration meeting | * Presentations in Hall A Winter Collaboration meeting |
Latest revision as of 10:15, 3 February 2022
Strategy Meeting
Info
- 21:00- on Feb 03, 2022 (JST)
- Franco, Mark, Nue, Liguang, Guido, Joerg, Pete, Sho, Gogami
- via Zoom
Discussion (1)
- Possibility of HKS in Hall C (c.f. Collaboration Meeting 2021)
- Kinematics difference between Hall A and C.
Larger energy in Hall A which leads to a better S/N, but worse resolution. - Three cases are being studied, A: PCS+HKS+SHMS, B: PCS+HKS+HES, C: SPL+HKS+HES.
→ Solid angle / momentum resolution were shown after Q strength were adjusted for the B and C option.
- Kinematics difference between Hall A and C.
- Beam time
- When ?
→ Could be in 2026~ even in Hall C. - Moller 2024. SBS is being tried to be done before that.
→ HKS would be in 2029~ in the case of Hall A. - Could HRS-HRS (hyper) be jumped in (in 2024? for example)?
→ HRS-HKS could take a similar time to install. - Can be longer ?
- When ?
→ 1. HRS-HKS in Hall A (2024?), 2. XXX-HKS in Hall C (2026~), 3. quick HRS-HRS(HKS) experiment (+ α later) in Hall A
- PAC
Report
- Information to share
- PCS status (Nue, Sho)
- Feb 6 (Newport News)
- will be unloaded in ESB
- Hall A / C simulation (Sho, Nue)
- PCS status (Nue, Sho)
Discussion (2)
- Draft prepared (nnΛ)
- Significance calculation → Bishnu will send us how he obtained the result.
- Nue will ask Harada san for his opinions.
- Presentations in Hall A Winter Collaboration meeting
- Toshi: nnΛ
- Guido: HKS